The Jiyang Line (), also known as Jiyang Tram, is the eighth line and also the first modern tram line of Jinan Metro system and also the first tram in operation in Shandong province. It was open for passenger service on 30 December 2025 at 10:00 am. The total length of this line is 36.1 km. The line will also be the first to cross the Yellow River in Shandong province. The project will cost a total of 6.65 billion yuan ($1.01 billion), and the average cost per kilometer will be 198 million yuan, less than the cost of a metro line.

Stations The operating hours are from 6:00 am to 8:50 pm for and from 6:30 am to 9:00 pm for .

The peak hours are from 6:00 am to 9:00 am and from 5:00 pm to 9:00 pm with 15 minute intervals on weekdays. Otherwise, trains run on schedule within 20 minute intervals.

OSI: Out of system interchange. - Station not opened. Station name Transfer Structure Type Distance Location (Both OSI) MDKUnderground0.000.00Licheng JiyangUnderground11.5011.50Underground3.2014.70Underground4.5019.20Underground2.8022.00Elevated2.5024.50Elevated3.0027.50Underground2.2029.70Underground2.1031.80Underground1.8033.60At-grade2.5036.10

Fares A one-way fare is 2 CNY for all destination of this line.

References