Dandong-Pyongyang through train, numbered as 95/85 in China and 51/52 in DPRK, is an international train run between Dandong and Pyongyang. It commences operation since 1 January 1954.

From 30 Jan 2020, it was suspended due to COVID 19 until 12 March 2026.

Overview

The train service began operating on April 1, 1954, initially running every other day. Since January 1, 2013, it has operated daily, using 3 to 4 hard sleeper carriages. During peak travel periods, the number of carriages can increase to as many as 8. In the 1980s, this train typically carried only a dozen or so passengers per trip, but in recent years, the number of travelers has increased significantly. The train is also used by ordinary North Korean citizens. Chinese immigration and customs procedures are conducted in the waiting hall of Dandong Station, where passengers complete their entry or exit formalities before boarding or after disembarking.

After crossing the Sino–Korean Friendship Bridge (referred to by North Korea as the “DPRK–China Friendship Bridge,” Korean: 조중친선다리), the train arrives at Sinuiju Youth Station. Here, the train stops for an extended period while North Korean border guards board the train to conduct routine inspections and process immigration procedures for passengers. The actual stopping time depends on the efficiency of the inspection.坐上火车去平壤 ,《中国新闻周刊》,2015-07-24 According to the timetable, the journey from Sinuiju to Pyongyang is scheduled to take 4 hours, but in reality, it usually takes 6 to 7 hours.

On May 27, 2015, CR Shenyang launched a special North Korea-bound tourist train departing from Shenyang. After departing Shenyang Station, it arrives in Dandong in the early hours of the following day. Tourists complete their exit procedures at Dandong Station and then transfer to Train 95/85 to enter North Korea.

Train Composition

The CR train uses CR25G coaches assigned to CR Shenyang. It normally runs in a 7-car formation: five hard-sleeper coaches, one power-car with air-conditioning generator, and one Korean State Railway baggage car. On-board service is handled by the CR Shenyang.

The KSR train consist uses Type 30 coaches manufactured by Nanjing Puzhen as a derivative of the CR25G. It runs in a 6-coach formation: five hard-sleeper coaches (Korean: 일반침대 30, 66 berths each) and one baggage car, with passenger services provided by KSR Pyongyang.

At Dandong Station, the train will also pick up or set out two sleeper cars from Beijing–Pyongyang train K27/28, coupling or uncoupling them as required for the through service. SectionDandong↔Pyongyang(CR)Pyongyang↔Dandong(KSR)Sinuiju↔PyongyangCoach no.NilNil19-23Nil14-18NilNil24-25Type수하물30LuggageKD25GAir-conYW25GHard sleeper수하물30Luggage일반침대30Standard sleeper수하물30Luggage식당차30Restaurant일반침대30Standard sleeperOperatorKSR PyongyangCR ShenyangKSR PyongyangKSR Pyongyang

Loco shift The train is hauled by DF5(Korean:내연100) from CR Shenyang or KSR Kaechon for Dandong-Sinuiju section. And the Sinuiju-Pyongyang section is hauled by DF4 or DF4B(Korean:내연200)from KSR Pyongyang. SectionDandong ↔ SinuijuSinuiju ↔ PyongyangLocoOperatorShiftDF5CR Shenyang/KSRDandong driver/KSR driverDF4 DF4B

KSR

KSR driver

Timetable

1 hour difference

95/52Stop85/51Train no.DayArrivalDepartureArrivalDepartureDayTrain no.95Day 1Departure10:00Dandong16:23ArrivalDay 185↑ (Beijing Time UTC+08:00) / (Pyongyang Time UTC+09:00) ↓95/52Day 111:1013:0915:3217:13Day 151/855214:1214:29Tongrim14:2714:31515215:4315:53Chongju Youth13:1113:17515218:45ArrivalPyongyangDeparture10:2551

References

See also

Beijing-Dandong-Pyongyang through train Pyongui Line

External links

D6 离开丹东到朝鲜新义州的时间是9:30