The acquisition of railways by the Lower Silesian Voivodeship marshal's office involves the gradual, paid or unpaid transfer of railway lines previously managed by PKP Polskie Linie Kolejowe to the ownership of the Lower Silesian Voivodeship. By the end of 2022, 23 lines spanning approximately 240 km were acquired, with passenger services restored on five sections. The Lower Silesian Voivodeship is the only region in Poland systematically acquiring railway infrastructure. The infrastructure is managed by the . The acquired lines are operated by Lower Silesian Railways.

Legal framework The organization of regional transport is the responsibility of voivodeship marshals. Under Polish law, local government units may acquire railway lines that are not critical to the national railway network and serve only local purposes. Typically, these are lines with no or minimal train operations. Acquisition can be paid or unpaid. The process is governed by Article 39 of the Act on the Restructuring, Commercialization, and Privatization of the Polish State Railways, dated 8 September 2000.

Regional railway characteristics The Lower Silesian Voivodeship has a high rate of railway usage for local and regional transport. In 2018, the average resident made 9.4 rail trips annually, the 4th-highest in Poland. Regional and agglomeration services accounted for 88% of trips, with most occurring in the Wrocław metropolitan area. Two operators serve the region: Polregio and the voivodeship-owned Lower Silesian Railways, which is gradually displacing other operators in regional and local transport.

The voivodeship's policy focuses on restoring lost connections and expanding local services. Major obstacles include ongoing renovations and insufficient track capacity.

Compared to other Polish regions, Lower Silesia historically had the densest railway network, serving all cities until 1945, though the Eulengebirgsbahn declined in the 1930s. Post-war years saw the closure of lines deemed unprofitable. By 1989, 277 km of lines were closed, yet the region's railway network density remained the highest in Poland at 12.4 km per 100 km². By 2009, this dropped to 8.8 km per 100 km² after an additional 700 km of lines were closed since 1990.

History

The 1990s saw widespread closures of unprofitable railway lines in Lower Silesia, which had a dense network. By 2000, around 40 local lines, such as Malczyce–Jawor, –Trzebnica, and Dzierżoniów Śląski–Bielawa Zachodnia, were closed. These closures primarily affected small towns distant from major centers, exacerbating transport exclusion in Poland. Key reasons included deteriorating infrastructure and declining demand.

The first regional initiative to introduce local transport on Polish State Railways' infrastructure was the establishment of Lubuska Kolej Regionalna in 1991. The first attempt at railway line acquisition occurred in 2001 in Hajnówka County, where the county head planned to take over a section of from Hajnówka to Białowieża.

The first line acquired by the Lower Silesian Voivodeship was . Acquisition efforts began in 2007, and after a nine-month renovation, the line was reopened in 2009. The line became popular and overcrowded, leading to plans in 2022 for electrification and the construction of a passing loop.

In 2022, the Kolej Plus program was launched to support railway transport with government funds. The voivodeship submitted four projects, but the revitalization of the Kobierzyce–Piława Górna line, aimed at improving connectivity with Ząbkowice County, was rejected.

PKP Polskie Linie Kolejowe has been reluctant to transfer assets, leading to procedural disputes. In Lubusz Voivodeship, on , only embankments were transferred without tracks, which were dismantled for planned bike paths. The transfer of the Dzierżoniów–Bielawa section was delayed but completed by 2022. Declaring intent to acquire a line prevents the Polish State Railways from dismantling it.

Acquired railway lines As of 28 March 2024, the voivodeship has acquired the following railway lines:

+ Line number Section Kilometer range Status 283 Jelenia Góra – Lwówek Śląski km 2.140 to km 33.316Out of service 284 Jerzmanice-Zdrój – Lwówek Śląski km 24.444 to km 48.157Out of service Szczawno-Zdrój – Sobięcin km 3.400 to km 17.140Out of service Strzegom – Marciszów km 44.835 to km 73.040Out of service Duninów – km 7.880 to km 31.100 (10.970) Partially active Pisarzowice – Jelenia Góra km 7.945 to km 37.818 Under construction Kobierzyce – Piława Górna km 0.174 to km 38.645 Under construction 311 – State Border km 29.844 to km 43.138In service Wojcieszów – Nowy Kościół km 16.090 to km 33.430Out of service 316 Chojnów – Rokitki km 21.832 to km 26.755In service Gryfów Śląski – Świeradów-Zdrój km 0.668 to km 16.544In service Srebrna Góra – Bielawa Zachodnia km 12.380 to km 28.295 Under construction Kondratowice – km 46.200 to km 51.139Out of service Ciepłowody – Ciepłowody km 9.982 to km 13.282Out of service Kłodzko Nowe – Stronie Śląskie km 9.700 to km 24.622 Tender issued Nowa Wieś Grodziska – Nowa Wieś Grodziska km 0.303 to km 2.065Out of service – km 1.260 to km 19.903In service Ścinawka Średnia – Radków km 6.248 to km 14.255Out of service Wolibórz – km –5.380 to km 0.000Out of service Roztoka – Roztoka km 13.332 to km 14.638Out of service Henryków – Ciepłowody km –0.279 to km 10.080Out of service 340 Mysłakowice – Karpacz km –0.247 to km 7.055 In service Bielawa Zachodnia – Dzierżoniów km –0.530 to km 5.118In service Kamienna Góra – Pisarzowice km 1.780 to km 3.040 Tender issued – km 0.600 to km 15.305Out of service

Duninów–Przemków Odlewnia railway from Rokitki to Niegosławice was operational since 1890 but began deteriorating in the 1990s. Passenger services on the Chocianów–Niegosławice section ceased in 1991, followed by freight services on the Przemków Odlewnia–Niegosławice section in 1994. In 2000, passenger services on the Rokitki–Chocianów section and freight services on the Chocianów–Przemków Odlewnia section were discontinued. By 2005, the final freight section from Duninów to Chocianów was closed, leaving only a 6 km freight section from Rokitki to Duninów for the 4th Regional Logistics Base.

On 24 January 2019, the voivodeship approved the acquisition of the Duninów–Chocianów section, formalized on 16 December 2020. Renovation took 14 months, and passenger services resumed on 11 December 2022 with the Legnica–Chocianów route.

In December 2023, the Chocianów–Przemków Odlewnia section was acquired, with track clearing starting soon after. Passenger services to Przemków are planned for late 2025, with further revitalization of the Przemków Odlewnia–Niegosławice section targeted for the 2026/2027 timetable to enable Legnica–Głogów connections via Przemków, Niegosławice, Gaworzyce, and Żukowice. A tender for the Chocianów–Przemków Odlewnia section was announced on 14 March 2025.

Kobierzyce–Piława Górna railway

connects Kobierzyce to Piława Górna on the Sudeten line, linking Wrocław with Ząbkowice County. Passenger services ceased in 1996, and all rail traffic stopped a few years later. In 2019, the voivodeship acquired the railway from the Polish State Railways. An attempt to include the railway in the Kolej Plus program for renovation by PKP Polskie Linie Kolejowe failed in April 2022. Nevertheless, the voivodeship proceeded, announcing a tender in December 2022 for works between Łagiewniki Dzierżoniowskie and Piława Górna. The tender required increasing the maximum passenger train speed to 80 km/h, meeting third-class railway standards, and upgrading level crossings with signaling. Plans included rebuilding the , , Wilków, and Przerzeczyn railway stations, and adding a new stop in Niemcza. Completion was initially set for 31 May 2024, but works were delayed.

The Łagiewniki–Piława Górna section was expected to be operational by December 2024, with the Kobierzyce–Łagiewniki section planned for the 2025/2026 timetable.

Szklarska Poręba Górna–State Border railway

The Szklarska Poręba Górna–State Border section is a 13 km non-electrified segment of Izera railway, running through the Jizera Mountains. Until 1945, it was electrified, but the German traction network was dismantled by the Red Army and taken to the Soviet Union as war reparations under an 8 July 1945 agreement. Passenger services on the Szklarska Poręba Huta–State Border section were suspended in 1947, and on the Szklarska Poręba Górna–Szklarska Poręba Huta section in 1957.

Renovation began ceremonially on 8 May 2009, extending from Szklarska Poręba to the Polish border and onward to Kořenov. The Wrocław-based firm Dolkom S.A. undertook the work, estimated at 14 million PLN. Originally planned for completion by 30 November 2009, delays due to a harsh winter pushed completion to mid-June 2010. The line was ceremonially reopened on 2 July 2010, with regular services (initially to Jakuszyce) starting the next day. In 2010, the timetable included six daily round trips between Kořenov and Szklarska Poręba Górna.

Chojnów–Rokitki railway The 8 km section of Chojnów–Rokitki railway from Chojnów to Rokitki was active from 1906 to 2002. The Lower Silesian Voivodeship Marshal's Office repeatedly sought to acquire this section from PKP Polskie Linie Kolejowe. In 2014, the line was slated for dismantling, but this was averted.

On 24 January 2019, the voivodeship approved the acquisition of the Chojnów–Rokitki section, excluding short segments at the Chojnów and Rokitki stations, formalized on 29 April 2019. Revitalization works took place between 2021 and 2022, and passenger services resumed on 11 December 2022 with the Legnica–Chocianów route.

Gryfów Śląski–Świeradów-Zdrój railway

The railway from Gryfów Śląski to Świeradów-Zdrój was originally divided into two railways: Legnica–Jerzmanice-Zdrój railway for the Gryfów Śląski– section and Mirsk–Świeradów Nadleśnictwo railway for Mirsk–Świeradów-Zdrój Nadleśnictwo. Until 1945, it was known as the Izera Mountains Railway due to its route near the Zajęcznik peak. Passenger services from Gryfów Śląski to Mirsk began in 1884, extended to Świeradów-Zdrój in 1909. Passenger services ceased on 11 February 1996, and freight services ended in 1998. In 1999, the Gryfów Śląski–Mirsk section was redesignated as .

Revitalization took approximately 18 months, costing 60 million PLN, with contributions of 5 million PLN from Świeradów-Zdrój and 1 million PLN each from Mirsk and Gryfów Śląski. The railway was ceremonially reopened on 7 December 2023, with passenger services starting on 10 December. Critics argued the railway would be unprofitable, favoring a bike path instead. However, Lower Silesian Railways reported over 6,000 passengers in December 2023 and 6,640 in January 2024, averaging about 200 daily passengers.

Kłodzko Nowe–Stronie Śląskie railway The railway from Kłodzko to Stronie Śląskie, opened in 1897, operated passenger services until 2004 and freight services until 2007 on the Ołdrzychowice OMYA–Stronie Śląskie section.

Acquisition efforts by Lower Silesian Roads and Railways Service faced ownership issues, resolved on 14 September 2023, when the railway was taken under 30-year management with an option for permanent acquisition.

Pending acquisition, Lower Silesian Railways launched a temporary bus service in September 2022 between Kłodzko and Stronie Śląskie, integrated into the train timetable. In 2024, the voivodeship announced plans to resume rail services to Stronie Śląskie in 2026. A tender for revitalization was issued on 29 January 2025.

Wrocław Zakrzów–Trzebnica railway The 19 km – section of , within the Wrocław metropolitan area, connects Wrocław to Trzebnica. Opened in 1886, it operated passenger services until 1991 and freight until 1999, except for the Wrocław Psie Pole–Wrocław Zakrzów section, which remained with PKP Polskie Linie Kolejowe.