The Baganuur 50 MW Battery Storage Power Station () is a battery storage power station in Baganuur, Ulaanbaatar, Mongolia.

History The contract to construct the power station was signed on 6September2024. Groundbreaking for the construction of the power station was held on 15September2024. In early December2024, testing was done to the battery. On 6December2024, the power station began to supply electricity to the central system of national grid.

Companies The power station was constructed by Envision Energy general contractor company from China. The Monhorus International company of Mongolia acted as the subcontractor.

Architecture The power station sits on a site area of 5 hectares.

Technical specifications The power station has an installed generation capacity of 50 MW and storage capacity of 200 MWh. It is connected to the 220/110/35 kV Baganuur Substation on its southeastern side.

See also List of power stations in Mongolia

References