HMAS Eyre (OPV 204), is the Royal Australian Navy's second ship of the s. The ship is based on the Lürssen OPV80 design, and was constructed by BAE Systems at the Osborne Naval Shipyard in Osborne, South Australia. She began sea trials in July 2025. Eyre was commissioned on 30 May 2026.
References