Line 4 is a loop line of the Shanghai Metro network. The older rolling stock 04A01 carry a bright purple colour belt to differentiate them from Line 3 trains which share a portion of its route, while the newer 04A02 stock features a yellow and purple livery, which the exact line is labelled using sticker or screens saying "Line 3" or "Line 4". To determine the direction of travel, the line that travels counter-clockwise is called the Outer Loop (), while the other line is known as the Inner Loop (). Although it is a loop line, trains returning to the depot use as a terminal to let all passengers disembark. The first segment of the line between and (running in a "C"-shape) opened on December 31, 2005. The remainder of the line opened on December 29, 2007. The line is colored purple on system maps.
History colspan="7" style="text-align: center" bgcolor=# | |-bgcolor=#cccccc !Segment!!Commencement!!Opened!!Length!!Station(s)!!Name!!Investment |-bgcolor=#be99e7 |style="text-align: left;"| Damuqiao Road — Hongqiao Road |rowspan="3"| 26 Dec 2000 |rowspan="3"| 31 Dec 2005 | | 5 | Pearl Line (second phase) |rowspan=3|¥12.6 billion |-bgcolor=#be99e7 |style="text-align: left;"| Hongqiao Road — Baoshan Road | | 9 | Line 3 & 4 realignment project |-bgcolor=#be99e7 |style="text-align: left;"| Baoshan Road — Lancun Road | | 8 | Pearl Line (second phase) |-bgcolor=#deccf3 |style="text-align: left;"| Lancun Road — Damuqiao Road | 22 Oct 2005 | 29 Dec 2007 | | 4 |style="text-align: left;"| Loop line connector project | |- style= "background:#; height: 2pt" | colspan = "7" | The line became China's first national "Worker Pioneer" metro line on the 11th October, 2009.
Construction accident On August 20, 2001, on 20.10 at construction site during excavating the foundation pit, earthmoving sudden landslide, killing four people died who were buried in the landslide.
At 4 o'clock in the morning on July 1, 2003, the Pudongnan Road-Nanpu Bridge section of Line 4 suddenly saw water seepage during the construction of the connecting passage between the upper and lower tunnels. After that, a large amount of quicksand poured into the tunnel, causing internal and external pressure imbalance, which caused partial collapse of the tunnel. It has a funnel-shaped settlement. At 9 o'clock in the morning, the podium of a nearby building on South Zhongshan Road collapsed; beginning in the early morning of the July 2, the flood wall of Dongjiadu Waima Road section began to sink and crack due to the settlement. The embankment collapsed in a serious accident. The Linjiang Garden Building near the scene also experienced subsidence, the most serious settlement exceeded in an hour, and the cumulative settlement reached . This incident affected the plan for the opening of the entire line of Line 4. In August 2004, the Dongjiadu section restoration project was started and it was restored with the opening of the second section in July 2007.Shanghai's "Line 4 Accident" awakened the dream of 100 billion investment in China's metro. China Business News. 2003-07-14. On November 5, 2004, the Shanghai Second Intermediate People's Court issued a judgement on the deputy project manager of the subcontractor for the construction of the intermediate air shaft and side channel freezing method. The court convicted him for the crime of a major liability accident which has a fixed-term imprisonment of two years and six months and a probation of three years. The project director representative has a fixed-term imprisonment of six-month with a probation period of two years. The general contractor's project manager for two years with a fixed-term imprisonment of one year and six months.Shanghai Second Intermediate People's Court issued "(2004) Shanghai Second Middle School Punishment Chuzi No. 71 Criminal Judgment".
At unbalanced subsidence was discovered. From January 22 to January 28, 2012, it was closed for an overhaul.The closure of Hailun Road Station on Line 4 during the Spring Festival will not affect Hailun Road Station on Line 10. Shanghai Metro Transportation and Management Center. 2012-01-17.The overhaul of Hailun Road Station on Line 4 will be completed on schedule and the first train will resume normal operation on the 29th. Shanghai Metro Transportation Management Center. 2012-01-28.
Stations
Service routes M - Mainline: Full Loop P - Partial Mainline: ↔ — ↑ Loop line towards (Outer Loop) ↑ —1.141.143●● 0.000.000Xuhui31 Dec 2005Underground Island● ●1.371.373ChangningElevated Side● ● Yan'an BRT1.412.785● ●0.963.747Elevated Island● ●1.665.4010PutuoElevated Side● ● 0.906.3012● ●1.407.7014● ●1.449.1417● ● 1.7210.8619Jing'anAt-grade Island● ●2.0312.8923Elevated Island & Side● 1.5114.4026HongkouUnderground Island●1.0715.4728Underground Island & Side●●1.4016.8730YangpuUnderground Island●●0.7217.5932●●1.4419.0335Pudong●● 1.4320.4637●●0.8521.3139●●1.3422.6541●●1.2123.864429 Dec 2007●●2.1325.9947HuangpuUnderground Split●●1.2227.2149Underground Island●●1.4728.6851●●1.1929.8753Xuhui31 Dec 2005●●0.6230.4955●●1.5132.0057●●0.6732.6759 — ↓ Loop line towards Yishan Road (Inner Loop) ↓ —1.1433.8162
Important stations : Interchange with line 3. To transfer to line 1, passengers need to exit through a tunnel inside Shanghai railway station and purchase a ticket to re-enter the station. : Interchange with lines 2 and 3. : Interchange with lines 2, 6 and 9. It is Shanghai's first 4-line interchange station. : The first platform-to-platform interchange station in the Shanghai Metro network. Interchange with line 8. : Serves Shanghai Stadium. : Serves the sports stadium of the same name and the biggest regional and interregional bus station in the city. Interchange with line 1. : Serves East China Normal University. Interchange with lines 3 and 13. : Serves Donghua University.
Station name change On 28 October 2006, Dongfang Road was renamed as the after station renovation for line 2 and the opening of line 4.
Headways <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> ! colspan="4" style="text-align: center" bgcolor=# | |-bgcolor=# | colspan=2| ||
|-bgcolor=#cccccc ! colspan=4 align=center|Monday - Friday (Working Days) |- |||7:00–9:00|| → → :About 3 min and 10 sec → shared track w/ → :About 3 min and 45 sec | - - :About 5 min and 30 min; - shared track w/ - :About 7 min and 30 sec |-bgcolor=#EFEFEF |Off-peak||9:00–17:00|| colspan=2 align=center|About 8 min |- |PM peak||17:00–19:30|| colspan=2 align=center|About 5 min |-bgcolor=#EFEFEF |Other hours|| Before 7:00After 19:30 | colspan=2 align=center|About 5 - 12 min |-bgcolor=#cccccc ! colspan=4 align=center|Saturday and Sunday (Weekends) |- |Peak||7:00–21:00|| colspan=2 align=center|About 6 min and 30 sec |-bgcolor=#EFEFEF |Other hours|| After 21:00 | colspan=2 align=center|About 5 - 12 min |- style= "background:#; height: 2pt" | colspan = "4" |
Technology Signaling Line 4 has been operating over capacity due to large passenger flows for a number of years. With the continuous extensions of operating time, the problems of aging equipment and increasing passenger demand will further increase the operating pressure of the two lines. In June 2021 it was announced that Shanghai Metro has started to update of the signal system and finish before December 31, 2024.Blueprint to bring Shanghai's New Cities closer These are the last lines in the system that are equipped with fixed block Alstom URBALISTM 200 system, not equipped with CBTC systems capable of headways as low as 90 seconds. CASCO successfully won the bid for the renewal and transformation of the signaling using Qiji TACS system.CASCO Qiji™ TACS is on the stage, Shanghai Line 3/4 will start to upgrade the signal system!
Rolling Stock The line operates with 6-car Class A trains. Fleet numbers Manufacturer Time of manufacturing Class No of car Assembly Rolling stock Number Notes |- bgcolor="#be99e7" | 168 || Siemens (0401,0402) CRRC Zhuzhou Locomotive Co., Ltd. (0403–0428) || 2004-2007 || A || 6 || Tc+Mp+M+M+Mp+Tc || 04A01|| 0401-0428(040011-041681)|| Line 4|| Original name: AC05.In February 2009, 8 trains used on line 2 (numbers: 0225-0232) returned to line 4. |- bgcolor="#deccf3" | 162 || SATCO (0430–0455) CRRC Changchun Railway Vehicles Co., Ltd. (0429) || 2014-2017 || A || 6 || Tc+Mp+M+M+Mp+Tc || 04A02 || 0429-0455(041691-043301)|| Line 4|| 13 trains (042171-042941, trainset 0437-0449) have been assigned to line 3.