The Palinpinon Geothermal Power Plant is a 192.5-MW complex of geothermal power stations in Valencia, Negros Oriental, Philippines
Background The first power station was commissioned in 1983, amidst a global oil crisis which began in 1973. It was operated by the state-owned Philippine National Oil Company-Energy Development Corporation (PNOC-EDC).
The Power Sector Assets and Liabilities Management Corporation (PSALM) would privatize the geothermal facility and place the facility under bidding.
Former PNOC affiliate, Energy Development Corporation (EDC) which became fully privatized in 2007, took over the operations of the Palinpinon facility in October 2009.
Facilities The Palinpinon Geothermal Power Plant consists of two stations Palinpinon I and Palinpinon II which are located apart. Both sources steam from the Southern Negros Geothermal Production Field (SNGPF).
Power stationUnitCapacityCommissionedPalinpinon I 3x steam turbines112.5-MW1983Palinpinon IINasuji20-MW 1993Okoy 520-MW1994Sogongon120-MW1995220-MWTotal 192.5-MW
References