Line 7 of Nanjing Metro is a northeast–southwest line running roughly parallel to the south bank of the Yangtze River. The line began operation on 28 December 2022. This line is also the first metro line to use GoA4 automated trains in Nanjing.
History Construction of Line 7 began on 29 November 2017.
The north section from Xianxinlu to Mufuxilu opened on 28 December 2022, the sorth section from Yingtiandajie to Xishanqiao opened on 28 December 2023, and the central section from Mufuxilu to Yingtiandajie opened on 28 December 2024.
To allow construction of middle section, both north and south section of line 7 suspended operation during 10 July and 18 August 2024.
Opening timeline SegmentCommencementLengthStation(s)Name Xianxinlu — Mufuxilu 28 December 2022 10 North section Yingtiandajie — Xishanqiao 28 December 2023 9 South section Mufuxilu — Yingtiandajie 28 December 2024 8 Central section
Stations
Station name Connections Distance Location 0.000 0.000 Qixia 0.834 0.834 1.402 2.236 1.765 4.001 1.23 5.231 2.002 7.233 1.405 8.638 1.996 10.634 Gulou 2.048 12.682 0.821 13.503 1.673 15.176 1.78 16.956 1.174 18.13 1.167 19.297 1.526 20.823 1.289 22.112 Jianye 0.699 22.811 0.911 23.722 0.924 24.646 1.591 26.237 1.161 27.398 0.979 28.377 0.853 29.23 1.755 30.985 1.36 32.345 0.595 32.94 2.052 34.992 Yuhuatai
References