The Niagara Falls Suspension Bridge was the world's first working railway suspension bridge, spanning the Niagara River from 1855 to 1897. It spanned and stood downstream of Niagara Falls, where it connected Niagara Falls, Ontario to Niagara Falls, New York. Trains used the upper of its two decks, while pedestrians and carriages used the lower. The bridge was the idea of Canadian politicians, and it was built by an American company and a Canadian company. It was most commonly called the Suspension Bridge, although other names included Niagara Railway Suspension Bridge, Niagara Suspension Bridge, and its official American name of the International Suspension Bridge.

The bridge was part of Canadian politician William Hamilton Merritt's vision to promote trade within his country and with its neighbor the United States. Many, including bridge builders, argued that a suspension bridge could not support the safe passage of trains. Nonetheless, the bridge companies hired Charles Ellet Jr., who laid a line by a kite across the chasm and built a temporary suspension bridge in 1848. Ellet left the project after a financial dispute with the bridge companies, who hired John Augustus Roebling to complete the project. By 1854, his bridge was nearly complete, and the lower deck was opened for pedestrian and carriage travel. On March 18, 1855, a fully laden passenger train officially opened the completed bridge.

The Suspension Bridge was a border crossing between Canada and the United States, and it played significant roles in the histories of the Niagara region and the two countries. Three railway lines crossed over the bridge, connecting cities on both sides of the border. The Great Western Railway, New York Central Railroad, and New York and Erie Rail Road differed in track gauge; the bridge used a triple gauge system to conserve space, overlapping two tracks on top of each other and using a rail of each to form the third track. The railroads brought a large influx of trade and tourists into the region around the Niagara Falls. In the time leading to the American Civil War, the Underground Railroad helped slaves in the United States escape across the Suspension Bridge to freedom in Canada. After the war, the bridge became a symbol of inspiration to Americans, encouraging them to rebuild their country and pushing them to quickly industrialize their nation.

The bridge's success proved that a railway suspension bridge could be safe and operational. Its wooden structures began to decay and were replaced with stronger steel and iron versions by 1886. In 1897 the bridge was replaced by the Whirlpool Rapids Bridge and the suspension bridge was dismantled.

Conception In the mid-19th century, the hinterlands of the North American East Coast opened up rapidly. In Canada, entrepreneur and politician William Hamilton Merritt helped establish several trade routes, especially in dredged waterways between the lake cities. He envisioned a U.S. and Canadian rail network to connect the Atlantic coast with new territories in the West, and this led to a railway suspension bridge across the Niagara River below the falls.

Merritt's vision for the Niagara Suspension Bridge was conceived at the Niagara River. In summer 1844 while taking a picnic on the river shores, near what was then the town of Clifton, Merritt read a letter from his sons to his wife. The younger Merritts were touring Europe and visited the town of Fribourg, Switzerland. Amazed by the Freiburg Suspension Bridge, they wrote to their parents, describing the wonders of the bridge in eloquent terms. Their writing had a profound effect on their parents, and the elder Merritts wondered if such a suspension bridge could be built across the Niagara. Merritt was driven to realize that vision, and he approached the relevant authorities, including Queen Victoria, for permission to start the construction of the suspension bridge. His efforts were rewarded in 1846; the state of New York and the government of Canada West approved the charters to form the Niagara Falls International Bridge Company and the Niagara Falls Suspension Bridge Company, respectively.

In the years before the first bridge was built over the Niagara River, the river was crossed entirely by boats. Powered by steam engines, vessels ferried people and carriages across the raging river at calmer points of the water. One of these vessels was the Maid of the Mist, which in 1846 became the first tourist boat to ply the waters of the Niagara River. The site for the Suspension Bridge was half a mile (0.8 km) from the Maid of the Mists landings. The selection of the bridge site was based more on aesthetics than technical ease; it was the narrowest point of the gorge— across and deep—that allowed a full view of the falls from the American side.

Construction

After the bridge companies were founded, they invited engineers to submit plans and cost estimates for a suspension bridge that carried a railway. The invitation was met with skepticism among the engineering community. At that time, there was not a suspension bridge that could allow a train to pass over it safely. While the Europeans were erecting suspension bridges by the hundreds, the Americans mostly ignored them out of safety concerns; in 1831 Sir Samuel Brown's Broughton Suspension Bridge in Britain had collapsed under the marching feet of a troop of soldiers, sending those on its deck into the River Irwell. Many American bridges had collapsed without experiencing weight and pressure equivalent to railroad traffic, and American engineers feared that any railway bridge would likely fail—especially a suspension bridge.

Four engineers responded: Edward Serrell, Samuel Keefer, Charles Ellet Jr., and John Augustus Roebling. All submitted designs for a suspension bridge. At the time of the bidding, Ellet and Roebling were acknowledged as masters of suspension bridge building in America. Roebling submitted two designs, a conservative single-deck suspension bridge and a double-decked version, both with meticulous calculations and drawings. Instead of relying solely on submissions, Charles Ellet Jr. took a proactive approach. When he got wind of the project in 1845, he wrote to Charles B. Stuart, chief engineer of the Great Western Railway, boldly proclaiming that he could build a bridge for any likely purpose across the Niagara. After the charters had been obtained, Ellet helped Stuart to sell the bridge companies' stock and offered to buy US$30,000 worth of stock himself. His efforts earned him the $190,000 bridge contract on November 9, 1847. The contract not only specified the maximum cost, but also the completion date, 1 May 1849, and a carrying capacity of at least 6,500 tons.

Charles Ellet Jr.'s temporary bridge

Charles Ellet Jr. used showmanship and dramatics to market his proposals to build suspension bridges in the United States. This raised his profile with the public and the engineering industry, helping him to win the contract for the Niagara Falls Suspension Bridge. Ellet's initial design for the bridge at Niagara placed all forms of transportation on a single deck. The railway track was in the middle of the deck, sandwiched between carriageways and footpaths on the outer sides. Moreover, trains would not go over the bridge; their cars would be disconnected from the heavy locomotives and pulled across the bridge by horses, cables, or lighter engines.

Before the work could begin, Ellet faced a common problem of suspension bridge construction: getting a line across the gap. Ellet's brainstorming sessions with his men raised several ideas including firing cannonballs with the line attached, towing it across the river with a steamer, and tying it to a rocket that would then be launched across the gorge. The bridge engineer chose an idea inspired by Benjamin Franklin's experiment with a kite, and similar to 15th-century inventor Leonardo da Vinci's plan to span a gap. Ellet also took the opportunity to generate publicity for his project. Organizing a kite-flying contest, he offered $5 () to any boy who flew a kite across the gorge and secured the kite string to the other side. Youths from nearby towns flocked in to participate in contest that was held in January 1848. Sixteen-year-old Homan Walsh crossed the river by a ferry upstream and walked to the Canadian side of the bridge site to launch his kite. He almost succeeded on his first attempt; his kite flew across and he waited until midnight for the wind to die and the kite to descend, but the line was cut on the sharp rocks and ice below. After staying eight days at a friend's house waiting for the ferry, which wasn't running because of ice in the river, Walsh finally retrieved his kite, flew it across the gorge, and secured its line to a tree.

Ellet and his team tied a heavier line to the kite string and pulled the joined lines across. They pulled successive heavier and stronger lines across until the final bridge cable— thick—was hanging across the gorge. The cable was suspended between two wooden towers tall, and attached to an iron basket. Ellet planned to use this system as a basket ferry to shuttle workers and materials across the gorge, saving time that would otherwise have been spent on land and ferry travel. Through media coverage and word-of-mouth, many people knew of Ellet's efforts and flocked to the site to watch the construction. On March 13, 1848, the system was completed, and the team planned to test it by pulling the empty basket across. The basket kept getting stuck halfway, so Ellet rode the basket to the problematic spot and noticed that the basket's rollers could not pass over a portion of the cable that had been accidentally flattened during the construction. He fixed the problem and proceeded to cross to the Canadian side and back, becoming the first person to cross the gorge. Although the bridge companies had prohibited Ellet from collecting tolls, he charged each person $1.00 for the chance to "observe first hand the engineering wonder of bridging the Niagara." On some days, the basket ferry conveyed up to 125 people across the gorge. Ellet was then ordered to stop this practice.

Continuing his construction, Ellet built two footbridges and joined them together to form an wide suspension bridge. He intended to use this temporary bridge as a scaffold for the construction of the permanent railway bridge. On July 29, 1848, the bridge builder inaugurated the span in his typical manner; standing in his horse-buggy like a gladiator in his chariot, Ellet sped across the bridge, which had railings for only a third of its length at that time. His stunt garnered further publicity for the bridge, and the toll collected from the span proved lucrative; $5,000 was collected in less than a year since its official opening on August 1, 1848. Disputes arose between the bridge companies and Ellet over their shares of the money and the companies charged that Ellet was late in his schedule and withheld payment. Ellet retaliated by mounting cannons at the bridge to claim ownership over it. In the end the matter went to court. The bridge companies paid $10,000 to Charles Ellet, and he left the project to work full-time on the Wheeling Suspension Bridge.;

The Niagara Suspension Bridge project was in hiatus for three years before the bridge companies engaged another renowned civil engineer, John Augustus Roebling, to complete it. The delay caused Roebling to miss out on the honor of building the first permanent bridge to span the Niagara; Serrell completed the Lewiston Suspension Bridge in 1851.

John Augustus Roebling's railway bridge