Rublyovo-Arkhangelskaya line () (Line 17, Graphite line) is a line of the Moscow Metro. The first section of the line, between Delovoy Tsentr and Bulvar Generala Karbysheva, was opened on 5 September 2026. This first section incorporated two stations, Delovoy Tsentr and Shelepikha, which were originally part of Bolshaya Koltsevaya line. The construction began in 2021 and is planned to end after 2028, opening in three phases. Originally, Phase 1 was scheduled to be completed by 2026–2027 constructing the section from Delovoy Tsentr to Lipovaya Roscha, and phase two is scheduled to open after 2028 expanding the line from Lipovaya Roshcha to Novorizhskaya station. In the future, it will be connected with the Biryulyovskaya line and is planned to extend up to the city of Krasnogorsk in 2030.

Stations +EnglishRussianTransferStatusOpeningIzumrudnye KholmyИзумрудные холмыPlanned2030KrasnogorskayaКрасногорскаяPlanned2030NovorizhskayaНоворижскаяUnder Construction2027SberCityСберСитиUnder Construction2027Lipovaya RoshchaЛиповая РощаUnder Construction2027StroginoСтрогиноUnder Construction2027Serebryanyy BorСеребряный БорUnder Construction2027Bulvar Generala KarbyshevaБульвар Генерала КарбышеваOpened on 5 September 20262026Narodnoye OpolcheniyeНародное ОполчениеOpened on 5 September 20262026ZvenigorodskayaЗвенигородскаяOpened on 5 September 20262026ShelepikhaШелепиха (within walking distance)Initially opened as part of Line 11, reopened with the opening of Line 172018 (as part of Line 11), 2026 (as part of Line 17)Delovoy TsentrДеловой Центр (within walking distance) (within walking distance) (within walking distance)Initially opened as part of Line 11, reopened with the opening of Line 172018 (as part of Line 11), 2026 (as part of Line 17)

References