Velodrome Station is a light rapid transit station of the Jakarta LRT Southern Line, located at Rawamangun, Pulo Gadung, East Jakarta, Indonesia. It is one of the six stations of the first phase of the LRT Southern Line which opened on 1 December 2019.

Velodrome Station is located near Rawamangun sports complex, which include the Jakarta International Velodrome (hence the name).

History During the construction, a skybridge was built between Velodrome Station to the nearby Pemuda Rawamangun Transjakarta bus rapid transit (BRT) station to the southeast. The skybridge was opened 26 July 2019, during the LRT's public trial between 11 June – 30 November. Velodrome Station along with the entire Southern Line phase 1 from Velodrome to Pegangsaan Dua (now Kelapa Gading) began commercial operationals since 1 December 2019. It was the terminus of the service line until an extension to was opened in 2026.

Station layout 3rd floorMezzanineInterplatform overhead crossing, musalla2nd floorCorridorFare gates, ticket counter and vending machines, retailsSide platform, the doors are opened on the right sideLine 1← Southern Line to Line 2 Southern Line to →Side platform, the doors are opened on the right side1st floorStreetEntrances/exits

Services Southern Line, to and

Gallery

References

External links

– Jakarta LRT official website