Lal Lal Iron Mine and Smelting Works were located close to the western branch of the Moorabool River, near the town of Lal Lal, Victoria, Australia, which lies on the Geelong-Ballarat railway line about 19 km from Ballarat. From 1875 to 1884, pig iron was made there in a blast furnace using iron ore mined at the site, locally produced charcoal, and limestone from a nearby deposit. The works ultimately proved to be uneconomic. It remains the only attempt to establish an iron smelting industry in Victoria.

The ruin of the blast furnace on the site is one of only three extant 19th-century blast furnace structures in Australia—the other ones being in northern Tasmania and southern New South Wales—and it is the only one of its type in the southern hemisphere. The site is on the Victorian Heritage Register (No. 1759) and the Register of the National Estate.

Historical context The gold boom created a market for mining machinery and led to foundries being set up in Ballarat. John Walker started the Union Foundry in Ballarat in March 1865. This company and the rival Phoenix Foundry also made locomotives for the Victorian Railways, There was a local demand for scrap-iron and pig-iron in the Ballarat area.

Pig iron was imported, often serving as ballast on sailing ships coming to Australia, and so sold for low prices. An early iron-smelting operation, the Fitzroy Iron Works had not been able to compete with imported iron, and there was no tariff protection of the local iron making industry. However, in the early 1870s, there was a sharp increase in the demand for iron world-wide; demand for iron became so strong in Australia that the price of imported pig-iron increased, from £4 10s.per ton in 1870 to £9 per ton in 1873, greatly advantaging locally manufactured iron. This high price was short-lived, but served as an impetus for ironmaking ventures in Australia.

Mineral deposits It is likely that the search for gold in the area led to the discovery of other minerals near Lal Lal. Lignite (brown coal) was discovered around 1857, located just alongside the later route of the Geelong to Ballarat Railway. The lignite was useless for iron-making, but limited lignite mining operations at Lal Lal led to a rail siding being built there, which was used to load pig-iron and unload coke and limestone.

In the 1860s, iron ore was found near the western bank of the Moorabool River about 5 km from Lal Lal. The iron ore deposit is limonite. The iron ore varied in depth from 2 to 4 metres and covered an area of approximately 10.6 hectares. The first lease on the iron ore was taken out in early 1873. The inferred resource was later estimated as being around two million tons of iron ore. Another estimate was 700,000 to 850,000 tons of iron oxide.

The iron ore from the deposit was analysed, around 1873, at the Ballarat School of Mines. +Lal Lal Iron Ore Analysis c. 1873.Picked Samples of Iron OxideSample 1 Sample 2Iron Oxide68.7170.44Silica17.3016.30Alumina4.893.58Calcium Carbonate 1.060.60Magnesium Carbonate0.470.83SulphurTraceTracePhosphoric AcidTraceTraceOrganic Matter0.450.74Hydroscopic Moisture6.406.64Loss0.720.87TOTAL100%100% Based on the above analysis, the iron metal content was relatively low, but was high enough to excite interest in mining and smelting the ore. The ore was low in phosphorus and sulphur, which Is an advantage for iron making. Its location close to users of pig iron—the foundries of Ballarat—was also an advantage.

Limestone—a flux material for iron-making—existed on a property called 'Lowndes Bridge', nearby to the station on the Geelong-Ballarat railway line then called ‘Leigh-road' (now called Bannockburn). There were also deposits of clay on the lease and enough trees to provide a supply of charcoal for a furnace.

History of operations

Lal Lal Iron Co. and first period of operation (1873–1875) In November 1873 a meeting of potential shareholders took place, at which was presented a report of a trial smelting of Lal Lal ore at the Union Foundry in Ballarat. The capital was fixed at £48,000 as 24,000 £2 shares. 12,000 for the promoters and 12,000 for sale to the public (offered at a premium of 2s 6d). Mr Peter Alroe was elected chairman and directors were elected.

In June 1874, some iron ore, from a location within 70 miles from Melbourne and close to a main railway line, was smelted at the Melbourne foundry of Drysdale and Fraser. It is almost certain that this ore came from Lal Lal, although those involved kept the precise location a secret. The iron produced was 'grey iron' suitable for castings.

Between February and July 1874, a tramway line was surveyed to run from the Lignite Siding at Lal Lal to the Iron Mine on the Western Moorabool River. Work on the furnace began some time before July 1874. Joseph Rowley, who had previously been at the Tamar Hematite Iron Co., was appointed blast furnace manager during the second half of 1875, and had some alterations made to the furnace before production commenced. The first iron was tapped on the evening of Tuesday 19 October 1875.

Lack of money—not all the shares on offer were taken up by the public—prevented the construction of the tramway and the company resorted to using bullock teams over the poor roads to and from the mine site. The roads were so poor that, until the construction of the tramway could be completed, the iron-making operations at Lal Lal would be forced to close down for eight or nine months every winter. Winter also prevented charcoal burning and storage, presumably due to wet weather.

The company had produced 127 tonnes of pig iron by January 1876 and constructed 805 metres of cart-road up the steep incline on the lease. The machinery then broke down completely, causing the company to immediately cease production. It was also determined that the steam engine was under-powered.

In October 1875 the company took steps to voluntarily wind up the original company and to dispose of the property and lease, with a view to a re-organisation to increase the capital.

Second period of operation (1876–1879) and No Liability Company In March 1876, he proprietors of the company called a meeting to form a company to buy out the first Lal Lal company, which had run out of cash. Shareholders would contribute 8s per share which entitled them to 1/480th of the new company. Shareholder were asked to submit the money as quickly as possible so that work could recommence at the site. The new No Liability Company was registered on 26 April 1876, with a proposed capital of £9,600 in 2,400 shares of £4 each.

By August 1878, a contract had been given to Joseph Rowley for the erection of new machinery. In September 1878, the company was trying to get cheap rates for rail transport and proposing to make iron pipes.

A new engine, boiler, machinery for the air blast had been installed, but the existing furnace was adapted to the new machinery and relit in October 1878, with the first tap being made on 18 October 1878. The works were officially opened by the Premier of Victoria, Graham Berry, on 26 October 1878. About 800 kilograms of iron was run into moulds on this occasion.

By the end of 1879, the Company found that the furnace was not able to keep-up satisfactory production and decided to erect a larger furnace. On 30 July 1880, the half-yearly meeting of the company was told that work had commenced on new furnace, which was capable of making 80 tons of iron per week, and that new blowing apparatus was being manufactured.

Last period of operation (1880 – July 1884) and Limited Company The new blast furnace went into operation on 20 March 1881, being tapped for its first iron on 26 March. It was blown out on 24 June 1881, when the roads became impassable. By then, the company had a foundry in Urquart Street, Ballarat, which would be able to take a part of the iron produced at Lal Lal to make castings.

The new blast furnace started again on 3 Feb 1882, after improvement works delayed its restarting. The furnace worked until it had made 350 tons and then heavy rains arrived and disrupted road transport—the tramway to the rail siding was still not yet built. The 'branch foundry' in Ballarat, had been a success.

The company was able to purchase second-hand rails and other iron hardware items that were needed to construct the tramway, from the Victorian Railways Department. However, in doing so it incurred a debt to that organisation, which was later of great significance.

On 24 July 1883 William Little, Auctioneer and Real Estate Agent of Ballarat, was successful in the registering the Lal Lal Iron Company as a limited liability company, and in that new company acquiring the assets—and liabilities—of the old No Liability Company. The capital of the new company was to consist of £22,500 divided into 15,000 shares of £1/10/- each, of which 7,500 shares were considered to have been fully paid up to £1 each.

In October 1883, the company cast iron pipes—said at the time to be, but not, the first made in Victoria—at its Urquart Street Ballarat foundry.

The long-awaited tramway finally was finished and in operation by April 1884. The tramway was successful, and it appeared that the iron works was at last capable of all-year operation. The company soon had a stockpile of 500 tons of pig iron at the siding, which it could not sell. This iron it instead used to feed its own foundry in Ballarat to produce castings, which were sold profitably.

In June 1884, the blast furnace at Lal Lal was extinguished due to the quantity of stockpiled iron. During the last fortnight of operation the furnace produced 82 tons of pig iron. Iron pipes were also being made at this time.

Unfortunately for the new company, it was soon discovered that the production cost of Lal Lal pig iron in 1884 was £5/17/4 a ton, which was well above the prevailing market rate of £4/10/- for imported iron. William Little and others took legal action against the old No Liabiiity Company—which had not been wound up yet—claiming that the old company had misrepresented the cost of production. The case was eventually settled out of court, but the new company decided to cease smelting at Lal Lal. It was never to recommence.

The foundry in Urquhart Street Ballarat continued to use the stored pig iron—turning it into castings—and remained profitable. The foundry operation, over time, considerably reduced the company's bank overdraft. However, matters came to a head when the Railway Department began pressing for payment for the rails and other hardware that the company had used to build the tramway. The company could not repay this debt and keep operating.

Attempted sale of the operation The mine lease and works were put up for sale in 1886. William Cleave Phillips, the company secretary, was apparently trying to sell it as a going concern. The advertisement states that, “Smelting operations can be started without delay”. The equipment of the Urquart-street foundry was also for sale. It does not appear that the Lal Lal site found a buyer in 1886, but it is possible that the foundry in Ballarat was sold. Either way, the foundry kept working—it was still winning work in December 1887—and the Lal Lal site remained dormant.

It was decided at an extraordinary general meeting of members held in Ballarat on 8 July 1889 to wind up the Limited Company. William Cleave Phillips, secretary to the company, was appointed liquidator. An auction sale was advertised in July 1891, clearly with the intention of selling it as a going concern—there is information about a lease of the tramway right-of-way up to 1893. This time the Ballarat foundry is not included in the sale. Nobody turned up to this July 1891 auction. The railways were then asked to remove the tramway rails—which they in effect owned—and the company (in receivership) asked for more time to remove its equipment from the lease. The lease was declared void on 5 July 1892.