Songjiang Tram (also Songjiang Tramway) is a light rail tramway in Shanghai, China. The system consists of two lines (T1 and T2) totaling with 42 stations. Unlike the Zhangjiang Tram, Songjiang trams use centenary power supply and steel-wheeled rail systems. Most of the route follows independent rights of way. Intersections with other road users give priority to trams allowing for running speeds of 25–30 km/h. Trains run from 6:00 till 22:00. With further extension of the network public transport modal split in Songjiang is expected to increase from the current 23% to 40%.“十四五”期间,上海松江交通将有这些重大变化
The tram system is operated by 30 light rail vehicles (LRVs), while other 4 lines in development of line directions. Estimated ridership for the line is 170,000 passengers per day.
A joint venture between Shanghai Shentong Metro Group and Keolis' Chinese joint venture, Shanghai Keolis, with Shanghai Shentong Metro Group holding 51%, has been awarded a five-year contract to operate and maintain the line.
Pricing schedule The fee is 2 yuan within 10 kilometers (inclusive) with an extra 1 yuan charge for each additional 10 kilometers. Children under 1.3m in height travel for free (accompanied by an adult).
Each station of Songjiang Tram is equipped with an automatic ticket vending machine. Shanghai Public Transport Card (physical card and mobile phone transportation card) can enjoy preferential transfers. The transfer discount policy for Shanghai public transport service is applicable, where when transferring to bus, subways or trams within 2 hours, the price is reduced by 1 yuan.
Since June 30, 2023, beside Shanghai Public Transportation Card, QR codes (WeChat, Alipay, etc.) and Transportation Union Cards from other regions are also supported in Songjiang Tram.
History Opening timeline SegmentDate openedLengthStation(s)Name T2 Zhongchen Road - Canghua Road 26 December 2018 20 Line 2 Phase I T1 Canghua Road - Xinmiaosan Road10 August 2019 17 T1 Phase I T2 Zhongchen Road - Jinxi Road 6 T1 T2 co-line section T1 Xinmiaosan Road - Railway Station 30 December 2019 5 T1 remaining section T2 North Sanxin Road - Xiangkun planned (start construction 2021)上海松江有轨电车T2线即将西延伸 线路走向及站点出炉 8 T2 phase 2 T4 New Songjiang Road - Jingliu Road planned (start construction middle section: 2022) 22 T5 Dongjing - Xinmaoting Road planned (short term) 21 T5 East Sheshan - Sheshan planned (short term) 2 Branch line T3 Chedun - Yushu Road planned (long term) T6 Dongjing - Qixin Road planned (long term) Note: The first phase of Songjiang Tram T2 Line includes Songjiang Tram T5 Line Thames Town West Station-North Sanxin Road Station. After the completion of Songjiang Tram T5 Line, this section will be operated by Songjiang Tram T5 Line.
The first section of the system, with 20 stations, opened on 26 December 2018.
A section (including the remaining section of T2, and part of T1) opened on 10 August 2019.
The remaining section of T1 (from Xinqiao Railway Station to Xinmiaosan Road) opened on 30 December 2019. The section is in length.
In 2020, the Songjiang tram T2 line construction project won the 2018-2019 Shanghai Municipal Engineering Gold Award.松江有轨电车2号线项目 获市政工程金奖 .东方网
The opening time of Chenta Road station on T1 is still unknown.
Passenger flow From December 26, 2018, to February 9, 2019, the total passenger flow of Songjiang tram T2 line reached 478,334, and the average daily passenger flow was 10,398.2018年12月26日至2019年2月9日,松江有轨电车T2线总客流达478334人次,日均客流为10398人次 From December 26, 2018, to April 4, 2019, Songjiang tram T2 line transported a total of 1.084 million passengers, with an average daily passenger flow of 10,845, of which a single-day passenger flow reached 20,314 on December 31, 2018.2018年12月26日至2019年4月4日,松江有轨电车T2线共计运送乘客108.45万人次,日均客流10845人次,其中2018年12月31日单日客流达20314人次。 From the opening of trial operation on December 26, 2018, to June 25, 2019, the total number of passengers carried was 2,108,687, the average daily passenger flow was 11,586, and the maximum passenger flow in a single day was 20,478. 再遇窘境┆松江有轨电车路权之争如何解决? In 2021 the total passenger flow of the two lines is 9.1778 million; the average daily passenger flow of the two lines 25,100 passengers, and the highest passenger flow in a single day occurred on December 31, 2021, with 38,000 passengers.
Stations Songjiang Tram T1 All stations are in Songjiang. Songjiang Tram service routes M - Mainline: Canghua Road ↔ Railway station Routes Station name Connections Distance Opening Platform Door opening M Chenta RoadTBA Symmetrical side Right●Canghua Road0 10 Aug 2019 Symmetrical sideLeft●North Sanxin Road0.499 Staggered side Right●Canghui Road●0.6351.134●Yushu Road●0.5671.701Symmetrical side●Rongle Road North Xilin Road●0.9782.679IslandLeft●North Renmin Road●0.6063.285Symmetrical sideRight●● 0.3453.630 Island Left●North Guyang Road●0.5604.190●Rongle Road Tongbotang Road●0.3894.578 Symmetrical side Right●North Fangta Road●0.7525.330●Songdong Road●0.8806.210Staggered side●Songwei Highway●0.5796.790Symmetrical side●Baosheng Road●0.7907.580 Staggered side●Dongxing Road●0.5718.151●Lianyang Road●0.7128.863●Jinxi Road 0.6869.549●Caonong Road0.59010.139●Xinmiaosan Road0.89611.035Left●Caohe Road0.68811.723 30 Dec 2019 Right●Xinche Highway0.68612.419 Symmetrical side●Xinzhen Street0.69613.115●Xinzhan Road0.58713.712Staggered side● Railway station0.96014.672Symmetrical side
Songjiang Tram T2 The current operating mileage is about 14.0 kilometers with 20 stations (excluding the common line section).
All stations are in Songjiang Songjiang Tram service routes M - Mainline: Full loop Routes Station name Connections Distance Opening Platform Door opening M — ↑ Loop line towards ) (Inner Loop) ↑0 -●Guangfulin Road North Guyang Road0.5750.575 26 Dec 2018 Island Left●Guangxing Road0.7101.285●Rongning Road0.6531.938 Symmetrical side Right●Ronghui Road0.7172.655●Zhongchen Road1.4404.095 10 Aug 2019 Staggered side●Xutang Road0.8864.981 Left●Mingnan Road0.3165.297●East Jiangtian Road1.0036.300 Right●Jinxi Road0.2906.590●Lianyang Road0.6867.276 26 Dec 2018●Dongxing Road0.7127.988●Baosheng Road0.5718.559●Songwei Highway0.7909.349 Symmetrical side●Songdong Road0.5799.929 Staggered side●North Fangta Road0.88010.809 Symmetrical side●Rongle Road Tongbotang Road0.75211.561●North Guyang Road0.38911.949 Island Left●0.56012.509●North Renmin Road0.34512.854 Symmetrical side Right●Rongle Road North Xilin Road0.60613.460●Yushu Road0.97814.438 Symmetrical side Right●Canghui Road0.56715.005 Staggered side●North Sixian Road0.63515.640 Left (Inner Loop) Right (Outer Loop)●Sixian Road0.85816.498 Left●Wencheng Road0.48716.985 Right●West Thames Town0.84617.831●North Thames Town0.40418.235●Longyuan Road0.97019.205●Jiangxue Road1.07820.283●Xinsongjiang Road North Xilin Road0.50120.784●North Renmin Road Xinsongjiang Road0.40721.191 Island Left●Wenhui Road1.16322.354●Mejiabang Road0.48822.842●Guangfulin Road (Donghua University)0.49723.339 Symmetrical side Right●Longma Road0.61923.958 Staggered side Left● 0.87524.833 Symmetrical side Left (Inner Loop) Right (Outer Loop) — ↓ Loop line towards Guangfulin Road North Guyang Road (Outer Loop) ↓ —0.575 -
Future expansion Under construction The west extension of the T2 line started construction on 19 February 2021. 关于上海市松江区有轨电车T2西延、T4、T5项目进展意见 It runs from Sanxin North Road to Xiangkun Road, with a total of 9 stations, with a total length of about 7.4 kilometers. The line runs along Xinsongjiang Road, Wensong Road, Dingsheng Road, and Wenxiang Road from east to west, with a total of Sanxin North Road Station, Chenta Road Station, Dingyuan Road Station, Dingsong Road Station, Dingwen Road Station, and Dingsheng Road. 9 stations including Lu Station, Hexi Street Station, Kunde Road Station and Xiangkun Road Station.
In order to meet the needs of line parking and operation management, it is proposed to set up a Xiaokunshan parking lot, located at the starting point of the western section of the second phase of the project, at the northwest corner of the Xiangkun intersection of Wenxiang Road, with a total land area of approximately 0.97 hectares. At the same time, in order to ensure the operation needs of the west extension of the T2 line, a total of 5 substations have been set up across the line, of which one civil substation is combined with a parking lot, and the other 4 are box-type substations.
Future plans Eventually the plans call for 7 tram lines with a total length of about 150 km.
Technology Depots and yards Chenta Road Depot is a depot for Line T1. It has inspection lines and temporary repair lines, and can also carry out work such as overhauls. Up to 77 trains can be stored. Xinqiao Yard is a stabling yard of Line T1, which can store 8 trains. Songjiang University Town Yard is a stabling yard of Line T2. It has inspection lines and temporary repair lines. It can also receive new cars, repaired cars, and complete overhauls. Up to 33 trains can be stored.
Rolling stock
A joint venture of Alstom and Shanghai Rail Traffic Equipment Development Company was awarded a €72 million contract in April 2015 to supply 30 Alstom Citadis 302 trams. The first Silkworm low-floor LRV was delivered on 21 November 2016. The trams can carry 300 passengers.
See also
References
External links T2 tram line on the right tracks after trial test run - 11 October 2017 test run