Pit 5 Dam is a run-of-the-river hydroelectric dam on the Pit River in Shasta County, northeastern California, about south of Big Bend. It is part of the Pit 3-4-5 hydroelectric project owned by Pacific Gas & Electric Company.

Specifications The concrete gravity diversion dam is high and long. It has a gated spillway controlled by four steel wheel gates, and a diameter river outlet for regular releases. An intake structure diverts water into a long penstock to the Pit 5 Tunnel forebay reservoir, from which a second tunnel connects to the Pit 5 power station. There are four 40 MW generating units, each fed by a -long penstock.

History The dam and power station were authorized in 1942 and constructed as a wartime project, and the first power was generated on April 29, 1944. Construction of the dam and power station dewatered a stretch of the Pit River known as the "Big Bend". When the projects were relicensed in 2007, a minimum release into the river was established, to provide recreation benefits such as boating and fishing, and to improve riparian habitat.

See also List of dams and reservoirs in California

References