Line 1 of the Xiamen Metro is a subway line in Xiamen. The first section, running from to , has 24 stations and is long. It began operations on 31 December 2017.This is the first subway line in China which has a sea crossing bridge section.
History The 30.3-kilometre long, 24-station first phase of the line commenced construction on 1 April 2014 and tunnelling works were completed in March 2017. Trial runs were held from 6 October 2017 to 11 October 2017 and the line opened to the public on 31 December 2017.
Opening timeline SegmentCommencementLengthStation(s)Name Yannei — Zhenhai Rd 31 December 2017 24 Phase 1
Map
Stations
Station name Connections Distance Location 0.000.00Jimei XKS Xiamen BRT0.850.851.612.461.263.721.074.791.326.111.167.271.558.820.649.461.0710.532.6113.143.8216.96Huli1.5418.501.3419.840.8820.720.9721.690.8022.49Siming1.0823.571.0424.610.7125.32Xiamen BRT1.3426.660.8227.481.2328.710.8829.59
Rolling stock
Services on the line are provided by a fleet of six-car, aluminum-bodied trains manufactured by CRRC. These trains are long and wide, with a capacity of up to 2062 passengers.
References