The is a diesel-electric multiple unit (DEMU) train type operated by East Japan Railway Company (JR East) in the Niigata and Akita areas of Japan from 2019.

Design The GV-E400 series trains are the first diesel-electric multiple units (not including hybrid train) to be operated by JR East, with diesel engines driving generators, which in turn power electric traction motors. The trains have stainless steel bodies and a maximum speed of .

Internally, the sets use LED lighting throughout. Passenger accommodation consists of a mixture of longitudinal bench seating and transverse seating bays. The Niigata-area sets use pink seat moquette, and the Akita sets use blue seat moquette.

The design of the GV-E400 series served as the basis for the H100 series units operated by JR Hokkaido.

Operations

The GV-E400 series trains are scheduled to be used on the following lines. Niigata area (from FY2019) Uetsu Main Line (Niigata and Yamagata Prefectures) Shinetsu Main Line (Niigata Prefecture) Yonesaka Line (Niigata and Yamagata Prefectures) Banetsu West Line (Niigata and Fukushima Prefectures) Akita area (from FY2020) Tsugaru Line (Aomori Prefecture) (From 03 March 2021 until 14 March 2025) Gono Line (Akita and Aomori Prefectures) Ou Main Line (Akita and Aomori Prefectures)

Formations The trains are formed as single-car units classified GV-E400 and two-car units classified GV-E401 + GV-E402.

History

Details of the new trains were announced by JR East on 4 July 2017. A total of 63 vehicles are scheduled to be built, entering service in the Niigata area from 2019, and in the Akita area from 2020.

One single-car unit and one two-car unit were delivered from the Kawasaki Heavy Industries factory in Kobe in January 2018 for test-running and evaluation.

The first train entered service on 19 August 2019.

Fleet The depots and deliveries dates for the fleet are as shown below. GV-E400 Set No. Depot Delivery date GV-E400-1 Niitsu January 2018 GV-E400-2 Niitsu May 2019 GV-E400-3 Niitsu September 2019 GV-E400-4 Niitsu December 2019 GV-E400-5 Niitsu December 2019 GV-E400-6 Niitsu January 2020 GV-E400-7 Niitsu January 2020 GV-E400-8 Niitsu February 2020 GV-E400-9 Akita July 2020 GV-E400-10 Akita September 2020 GV-E400-11 Akita November 2020 GV-E400-12 Akita November 2020 GV-E400-13 Akita December 2020 GV-E400-14 Akita December 2020 GV-E400-15 Akita january 2021 GV-E400-16 Akita January 2021 GV-E400-17 Akita February 2021 GV-E400-18 Akita February 2021 GV-E400-19 Akita April 2021 GV-E401+GV-E402 Car 1 Car 2 Depot Delivery date GV-E401-1 GV-E402-1 Niitsu January 2018 GV-E401-2 GV-E402-2 Niitsu May 2019 GV-E401-3 GV-E402-3 Niitsu September 2019 GV-E401-4 GV-E402-4 Niitsu September 2019 GV-E401-5 GV-E402-5 Niitsu December 2019 GV-E401-6 GV-E402-6 Niitsu December 2019 GV-E401-7 GV-E402-7 Niitsu December 2019 GV-E401-8 GV-E402-8 Niitsu December 2019 GV-E401-9 GV-E402-9 Niitsu January 2020 GV-E401-10 GV-E402-10 Niitsu January 2020 GV-E401-11 GV-E402-11 Niitsu January 2020 GV-E401-12 GV-E402-12 Niitsu January 2020 GV-E401-13 GV-E402-13 Niitsu February 2020 GV-E401-14 GV-E402-14 Niitsu February 2020 GV-E401-15 GV-E402-15 Niitsu March 2020 GV-E401-16 GV-E402-16 Niitsu March 2020 GV-E401-17 GV-E402-17 Akita July 2020 GV-E401-18 GV-E402-18 Akita November 2020 GV-E401-19 GV-E402-19 Akita December 2020 GV-E401-20 GV-E402-20 Akita January 2021 GV-E401-21 GV-E402-21 Akita February 2021 GV-E401-22 GV-E402-22 Akita April 2021

See also H100 series, a JR Hokkaido DEMU based on the GV-E400 series design

References This article incorporates material from the corresponding article in the Japanese Wikipedia.

External links

JR East press release