Line 10 of the Chengdu Metro () runs from Taipingyuan in Wuhou to Xinping in Xinjin. Currently, the line is long. In 2024, the line will be 43.9 km long with the 5.9 km northeastern extension (Phase 3) to People's Park.

Phase I of Line 10 began construction in July 2014 and opened in September 2017. Phase II began construction in 2016 and opened on December 27, 2019. It is the first line in Chengdu Metro to use 6-car Type A rolling stock for service.

Line 10's color is sky blue.

Opening timeline SegmentCommencementLengthStation(s)Name Taipingyuan — Shuangliu International Airport Terminal 2 6 September 2017 6 Phase 1 Shuangliu International Airport Terminal 2 — Xinping 27 December 2019 10 Phase 2Wuhou Shrine — Taipingyuan17 September 20253Phase 3 (Initial section)

Stations Service routesStation No. Station name Transfer Distance Location Qingyang ●●Wuhou●● ●●●● 0.000.00●●1.9801.980●●1.5843.564●●3.5757.139●● CTU1.8378.976Shuangliu●● CTU IPW1.0019.977●●5.09915.076●●1.49416.570●●2.34618.916●●3.67122.587Xinjin●●Xinjin Station Xinjin (IRW)Chenggui HSR2.59725.184●●2.82428.008●5.01933.027●1.25034.277●1.22035.497●1.25236.749

Notes

References