Line 3 of Qingdao Metro () is an underground metro line in Qingdao. The north section began operation on December 16, 2015, and the south section began operation on December 18, 2016.
Opening timeline SegmentCommencementLengthStation(s)Name Qingdao North Railway Station — Shuangshan 16 December 2015 10 Phase 1 (northern section) Shuangshan — Qingdao Railway Station 18 December 2016 12 Phase 1 (southern section)
Stations
station name Connections Distance Location QDK0.0000.000Shinan1.4101.4101.2782.6880.8753.5631.0214.5841.4966.080 0.7556.8351.5516.3860.9179.3030.77810.081Shibei / Shinan0.80110.882Shibei1.38912.2711.25113.5220.85114.3731.46915.842Laoshan / Shibei1.15316.995Laoshan1.37618.371Licang1.31619.6871.05520.7420.96621.7081.22722.935 QHK1.53724.472
References