The IND 63rd Street Line and BMT 63rd Street Line, also referred to as the 63rd Street Crosstown, Crosstown Route, or Route 131-A, are two rapid transit lines of the B Division of the New York City Subway system. The two lines run under 63rd Street on the Upper East Side of Manhattan, with a cross-platform interchange at the Lexington Avenue–63rd Street station.

Each line consists of two tracks in a stacked configuration, with the southbound tracks of each line parallel to each other on the upper level, while the northbound tracks are parallel on the lower level. Crossover connections between each line's respective tracks are located just to the west of the Lexington Avenue station. The IND line, the southern of the two lines, is served by M trains on weekdays and F trains on weekends and late nights; it connects the IND Sixth Avenue Line in Manhattan to the IND Queens Boulevard Line in Queens. It uses the upper level of the bi-level 63rd Street Tunnel to travel under the East River between Manhattan and Queens. The northern, BMT, line is served by the Q train at all times, although a limited number of N and R trains also serve the line during rush hours. Also known as the Second Avenue Connection, it links the BMT Broadway Line to the Second Avenue Subway, both in Manhattan. The crossover between the lines has been used in the past during service disruptions as well as during the Manhattan Bridge closures in the late 1990s.

These lines were conceived as part of the Metropolitan Transportation Authority's 1968 expansion plans, and along with the Archer Avenue lines and a small section of the Second Avenue Subway, they were the only portions of the plan to be completed before it was scaled back due to fiscal issues. The IND 63rd Street Line was originally planned to be extended further east into Queens as a super-express bypass of the IND Queens Boulevard Line. After these plans were abandoned in the mid-1970s, it was commonly referred to as a "subway to nowhere" because it ended one stop into Queens, without any infrastructure connecting to other subway lines in Queens. The 63rd Street Tunnel lay unused for over a decade, and its lower level, intended for future Long Island Rail Road (LIRR) service, was completed solely to support the subway line above it.

The IND 63rd Street Line between Queens and Manhattan opened on October 29, 1989, and was connected to the Queens Boulevard Line on December 16, 2001. The BMT 63rd Street Line in Manhattan was only used for regular service starting in 2017, when the Second Avenue Subway's first phase opened.

Extent and service

The following services use the 63rd Street Lines:

Service information Lines served Section of line Service Division IND Culver Local, Sixth Avenue Local, Queens Boulevard Express entire IND section IND Myrtle Avenue Local, Jamaica Local, Sixth Avenue Local, Queens Boulevard Local BMT Brighton Local, Broadway Express, Second Avenue Local entire BMT section (limited rush hour service) BMT Sea Beach Local/Fourth Avenue Express, Broadway Express, Second Avenue Local () Fourth Avenue Local, Broadway Local, Second Avenue Local ()

The 63rd Street Lines comprise two physical pairs of trackage; each track pair's mileage is measured via different subway chaining schemes. One is chained as part of the Independent Subway System (IND), and the other is chained as part of the Brooklyn–Manhattan Transit Corporation (BMT).

The IND line begins as a northward continuation of the IND Sixth Avenue Line at 57th Street station. It runs under Sixth Avenue and Central Park, turning east under 63rd Street and running through the 63rd Street Tunnel under the East River, with stations at Main Street on Roosevelt Island and at 21st Street-Queensbridge under 41st Avenue in Queens. At its eastern end, the line merges with the IND Queens Boulevard Line under Northern Boulevard, west of 36th Street station. This line is coded as chaining route "T", with the southbound track marked as T1 and the northbound track designated T2. Beneath the subway tunnel is a lower level used by the Long Island Rail Road (LIRR), where it heads to Grand Central Madison. It is connected to Grand Central Terminal as part of the LIRR's East Side Access project, which commenced operations in 2023.

The BMT line begins as a northward continuation of the express tracks of the BMT Broadway Line at the 57th Street–Seventh Avenue station. It runs under Seventh Avenue, Central Park and 63rd Street before turning north under Second Avenue and merging with the Second Avenue Subway. The tracks on this line are coded with BMT chaining, labeled as tracks G3 and G4 to distinguish them from the pre-existing G1 and G2 tracks associated with the 60th Street Tunnel and Astoria Line. The odd-numbered tracks carry southbound trains, while the even-numbered tracks carry northbound trains.

The two lines intersect at the Lexington Avenue–63rd Street station, where there are cross-platform interchanges for both northbound and southbound trains. Just west of Lexington Avenue-63rd Street, two diamond crossover tracks allow trains to switch between the two lines. This connection, not used in passenger service, allows trains to run from the Broadway Line to the Queens Boulevard Line and from the Sixth Avenue Line to the Second Avenue Line.

Service history The first segments of the two lines opened on October 29, 1989; the IND line opened between 57th Street and 21st Street–Queensbridge, and the BMT line opened between 57th Street-Seventh Avenue and Lexington Avenue-63rd Street. The BMT 63rd Street Line was not used for passenger service. The IND Line was usually served by , and trains; during this time, Q trains ran on the IND Sixth Avenue Line due to reconstruction of the Manhattan Bridge. From the line's opening until September 1990, service was provided by Q trains during weekdays, by B trains during weekends, and by an F/Q combination route late nights. Starting in September 1990, evening Q service was replaced by the B instead. In April 1993, the F/Q combination designation was dropped and was simply known as F. The JFK Express also served the IND line very briefly; the service was discontinued on April 15, 1990. From April to November 1995, as part of the Manhattan Bridge reconstruction, the bridge's north side (Sixth Avenue) tracks closed during middays and weekends; the Q ran on the BMT Broadway Line during these times, using the BMT 63rd Street Line and switching to the IND 63rd Street Line to Queens west of Lexington Avenue-63rd Street.

In May 1997, 63rd Street Shuttle service via the IND Sixth Avenue Line replaced F service during late nights. Between February 22, 1998, and May 22, 1999, service between the Sixth Avenue Line and the 63rd Street Line was suspended because of construction on the IND tracks. B and Q trains were cut back to 57th Street, and the late night shuttle suspended. During this time, a different shuttle provided full-time service between 21st Street–Queensbridge and 34th Street-Herald Square via the BMT Broadway Line; for instance, in 1995, this shuttle switched between the IND and BMT Lines west of Lexington Avenue station. On May 22, 1999, the B and Q returned to 21st Street–Queensbridge.

On July 22, 2001, the north side tracks of the Manhattan Bridge, which served the Sixth Avenue Line, closed. B and Q service on the IND 63rd Street Line was replaced with a full-time shuttle via the Sixth Avenue Line. On December 16, 2001, the 63rd Street Connector to the IND Queens Boulevard Line officially opened, and the F was rerouted to serve the IND Line at all times, replacing the shuttle and assuming its current service pattern.See:

On January 1, 2017, the first phase of the Second Avenue Subway opened, extending the Q (now running via the BMT Broadway Line), and some rush-hour N short turn trips, along the BMT 63rd Street Line. The Q and N then turned north to connect to the Second Avenue Subway, terminating at 96th Street. Before the Second Avenue Subway opened in 2017, the BMT line was generally not used for passenger service, except for detours due to emergencies or construction on other lines (including the aforementioned periods in 1995 and 1998). Because the line was not used in regular service from 1989 to 2016, it was not shown on the official subway map, except in 1995 and 1998. Prior to 2011, these tracks were also used to store train sets outside of rush hour. From August 28, 2023, through April 1, 2024, F trains were rerouted via the 53rd Street Tunnel between Queens and Manhattan, and weekday M trains were truncated to 57th Street in Manhattan, due to repairs in the 63rd Street Tunnel. An F shuttle train ran between Lexington Avenue-63rd Street and 21st Street-Queensbridge, stopping at Roosevelt Island, at all times except late nights. Shuttle buses ran between Queens Plaza and 21st Street–Queensbridge during the day and between Queens Plaza and Roosevelt Island at night.

In June 2025, internal MTA documents were leaked, indicating that a proposal to reroute M trains through the 63rd Street Tunnel and reroute F trains through the 53rd Street Tunnel would be presented for approval in fall 2025. If approved, the route swap would be implemented by December. The route swap is anticipated to reduce overcrowding at 63rd Street line stations, as well as reduce reliance on critical interlockings west of the 36th Street station in Queens. In September 2025, the MTA confirmed that the F and M trains would swap routings on weekdays starting on December 8, 2025, with the F running via 53rd Street and the M running via 63rd Street.

History

Early plans In February 1963, the New York City Transit Authority (NYCTA) proposed a two-track East River subway tunnel under 76th Street with unspecified connections to the rest of the transit network, at a cost of $139 million. In a May 2, 1963, report, the proposed site of the tunnel was switched to 59th Street. On May 24, Mayor Wagner suggested that a tunnel around 61st Street "be built with all deliberate speed". On October 17, 1963, the Board of Estimate approved a new East River tunnel sited at 64th Street, noting that it would cost $30 million and take seven years to build. The 64th Street site was said to be $5.3 million less expensive, "because of easier grades and smaller curves".

The lack of specificity about how the tunnel would be used was criticized at an early date. In December 1964, the Citizens Budget Committee said that the project, now shifted to 63rd Street, was "leading nowhere-to-nowhere". The Committee went on to propose three connections that were eventually adopted (connections to the BMT Broadway Line and IND Sixth Avenue Line, both at 57th Street, and to the IND Queens Boulevard Line near Queens Plaza), and one that was not adopted (a connection to the IRT Lexington Avenue Line).

The route was changed to 63rd Street because officials at Rockefeller Institute at 64th Street feared that heavy construction and later train movements so close to the institute's buildings might have adversely affected delicate instruments at the Institute and change the accuracy of the research being conducted. The Board of Estimate approved the revised 63rd Street route on January 14, 1965, at a budget of $28.1 million and a four-year timetable, with the connections to the rest of the transit network awaiting a study that was then scheduled for completion in mid-1966. The New York Times noted that "A variety of possible connections...are under study," including possible new lines under Madison and Second Avenues. The NYCTA's chairman, Joseph E. O'Grady, said that the tunnel and the subway connections would eventually be completed at about the same time, "since construction of the tunnel takes at least a year longer than the connections".