The Barauni–Samastipur section is a railway line connecting Barauni to Samastipur in the Indian state of Bihar. The line passes through the plains of North Bihar and the Gangetic Plain in Bihar.

Electrification

Former Railway Minister Lalu Prasad Yadav announced for the electrification of the Barauni–Samastipur–Muzaffarpur–Hajipur line and Muzaffarpur–Gorakhpur line (via Hajipur, Raxaul and Sitamarhi) in the Rail Budget 2008. The electrification began in 2011 and was completed in 2014.

The electrification work was completed in December 2014 itself. But the first passenger train to run with an electric locomotive was Maurya Express w.e.f. 23 November 2015.

Stations There are 9 stations between Barauni and .

Station code Station name Distance (km) BJU Barauni 0 BUJ Barauni Flag 2.71 TGA Teghra 7.35 BCA Bachwara Junction 16.35 STJT Sathajagat 22.80 DSS Dalsinghsarai 27.34 BSRA Basarhia Halt 31.57 NAZJ Nazirganj 35.21 UJP Ujiarpur 41.49 BLRI Belari Halt 45.93 SPJ 50.54

Speed limit The Barauni–Samastipur–Muzaffarpur–Hajipur line is not an A-Class line of Indian Railways. So maximum speed is restricted to 110 km/h.

Sidings and workshops The following sidings and workshops exist on the line: 100+ diesel locomotive yard capacity at Samastipur Freight terminal at Karpurigram railway station Workshop for wagon maintenance at Samastipur Barauni Thermal Power Station, Barauni Indian Oil Corporation, Barauni Major freight terminal at Garhara Yard

See also Muzaffarpur–Gorakhpur line (via Hajipur, Raxaul and Sitamarhi) Barauni–Gorakhpur, Raxaul and Jainagar lines Muzaffarpur–Hajipur section Samastipur–Muzaffarpur section

East Central Railway zone

References

|