Line 3 of the Changchun Rail Transit () is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006 and 31 December 2021. This line is currently long with 34 stations in operation.
Opening timeline SegmentCommencementLengthStation(s)Name Changchun Railway Station — Weiguang Street 30 October 2002 17 Phase 1 Weixing Square — Changchun Movie Wonderland 26 December 2006 16 Phase 2Weiguang Street — Weixing Square3 April 2007n/aconnection of Phase 1 and 2Furong Bridge 28 November 2017 -1(temporary closure)Changchun Railway Station — Huxi Bridge8 March 2021 -6 Huxi Bridge — Weimanhuanggong 31 December 2021 6 East extensionXi'an Bridge12 May 20231infill stations resumedFurong Bridge30 May 20231 During the temporary closure of Changchun Railway Station — Huxi Bridge section, Liaoning Road station has permanently abandoned due to original station being too close to new Furong Bridge Station and new Changchun Railway Station, became the second case in China where a rapid transit station abandoned after Xinhualu of Tianjin line 1 on 9 December 2001.
Future development A southern extension from Changchun Movie Wonderland to No.59 Middle School is under construction.
Stations Serviceroute Station name Connections Distance Location ●0.00Kuancheng / Nanguan ●1.301.30Kuancheng ●~ ~ CCT1.202.50 ●1.403.90Kuancheng / Luyuan ●1.205.10Chaoyang / Luyuan ●0.655.75 ●0.656.40 ●1.007.40 ●0.908.30Chaoyang ● Trams 54 and 550.959.25 ●1.0510.30 ● CET 0.9011.20at-grade crossing (Huguang Road) ●0.8512.05 ●1.6013.65 ●0.7014.35 ●0.5014.85at-grade crossing (Weiming Street) ●0.7515.60 ●1.0516.65Chaoyang / Nanguanat-grade crossing (Weiguang Street) ●0.6517.30 ●1.2518.90Nanguan ●0.8519.75 ●1.3521.10 ●1.0522.15 ●0.9023.05 ●1.1024.15 ●1.5525.70 ●0.8526.55 ●1.2027.75 ●0.9528.70 ●1.3030.00 ●1.5031.50 ●1.0032.50 ●1.2533.75at-grade crossing (Liuying Dong(East) Road) ●0.5534.30
See also Changchun Rail Transit
Notes
References