Line 1 of the Shenyang Metro () is a rapid transit line running from west to east Shenyang. It was opened on 27 September 2010. This line is 43.95 km long with 32 stations.
A eastern extension, consisting of 10 stations, started construction on 26 December 2020, and opened on 30 June 2025.
Opening timeline SegmentCommencementLengthStation(s)Name Shisanhaojie — Limingguangchang 27 September 2010 22 Phase 1Limingguangchang — Shuangma30 June 2025 10Phase 2
Stations (west to east) station name Transfer Distance Location 0.000.00Tiexi1.001.001.402.401.503.901.555.451.406.851.508.35Yuhong1.009.351.9511.30Tiexi1.0512.351.0013.351.4014.751.1515.90 SYT1.6017.50Heping0.9518.451.2019.651.1020.75Shenhe1.3022.051.3523.400.7524.15Dadong1.6525.801.3027.10ShenheHunnan
Rolling stock
Type Time of manufacturing Series Sets Assembly NotesType B 2008 - 2010 DKZ17 23 Tc+Mp+M+T+Mp+Tc Manufactured by Changchun Railway Vehicles
References