Line 1 is the main east–west line of the Suzhou Metro system, and it started service on April 28, 2012. Line 1 is the first rapid transit line in Suzhou and this line is operated by Suzhou Rail Transit Co., Ltd.
Construction Construction on Line 1 began on December 26, 2007, and was scheduled to be completed by 2012. It is a line running generally east–west, from Mudu in western Suzhou to Zhongnan Street in Suzhou Industrial Park.Suzhou News It will be 25 km long with 24 stations. On December 30, 2011, the first 21 cars for Line 1 have been delivered.[News of the Operator]
Opening timeline SegmentCommencementLengthStation(s)Name Mudu — Zhongnan Jie 28 April 2012 24 Phase 1
Stations
Station name Connections Distance Location 0.0000.000Wuzhong 1.140 1.140Huqiu 1.200 2.340 1.100 3.440 Tram line 1 1.240 4.680 1.170 5.850 0.900 6.750 1.060 7.810Gusu 1.360 9.170 1.140 10.080 1.270 11.350 0.800 12.150 0.810 12.960 0.800 13.760 1.090 14.850 0.950 15.800SIP 1.080 16.880 0.810 17.690 2.500 20.190 0.850 21.040 0.670 21.710 1.260 22.970 1.070 24.040 1.130 25.170
Operations
Intervals Weekdays & WeekendsPeriodTimeIntervalsweekdays morning rush hours(Peak)7:45 — 9:005m30sweekdays evening rush hours(Peak)17:00 — 18:105m30sweekends daily rush hours(Peak)11:00 — 19:305m30sOther hours(Normal)Exclude above rush hours7m55s
First Trains & Last Trains First Trains & Last TrainsFirst TrainFirst TrainLast TrainLast TrainMudu bound for Zhongnan JieZhongnan Jie bound for MuduMudu bound for Zhongnan JieZhongnan Jie bound for Mudu6:10 A.M. departs from Mudu Station6:10 A.M. departs from Zhongnan Jie Station22:00 P.M. departs from Mudu Station22:35 P.M. departs from Zhongnan Jie Station
Fares Fares start at 2.00 Yuan (¥) and can take 6 kilometers (km), 6 km to 16 km every additional 1.00 Yuan (¥) can take 5 km, 16 km to 30 km every additional 1 Yuan (¥) can take 7 km, 30 km and above every additional 1 Yuan (¥) can take 9 km, so the whole journey of Line 1 is 6 Yuan (¥).苏州轨道交通1号线试运营2元起步 .姑苏晚报.2012-04-06
From a select start station to a select destination station, please see the following fare table. Mudu station 2 Jinfeng Lu station 2 2 Fenhu Lu station 2 2 2 Yushan Lu station 2 2 2 2 Shizishan station 2 2 2 2 2 Tayuan Lu station 3 2 2 2 2 2 Binhe Lu station 3 3 2 2 2 2 2 Xihuan Lu station 3 3 3 2 2 2 2 2 Tongjing Beilu station 3 3 3 3 2 2 2 2 2 Guangji Nanlu station 4 3 3 3 3 2 2 2 2 2 Yangyu Xiang station 4 4 3 3 3 3 2 2 2 2 2 Leqiao station 4 4 3 3 3 3 3 2 2 2 2 2 Lindun Lu station 4 4 4 3 3 3 3 2 2 2 2 2 2 Xiangmen station 4 4 4 4 3 3 3 3 2 2 2 2 2 2 Donghuan Lu station 4 4 4 4 4 3 3 3 3 2 2 2 2 2 2 Central Park station 5 4 4 4 4 4 3 3 3 3 2 2 2 2 2 2 Xinghai Square station 5 5 4 4 4 4 3 3 3 3 3 2 2 2 2 2 2 Dongfangzhimen station 5 5 5 5 4 4 4 4 4 3 3 3 3 3 2 2 2 2 Culture & Expo Center station 5 5 5 5 5 4 4 4 4 3 3 3 3 3 3 2 2 2 2 Times Square station 5 5 5 5 5 4 4 4 4 4 3 3 3 3 3 2 2 2 2 2 Xinghu Jie station 5 5 5 5 5 5 5 4 4 4 4 3 3 3 3 3 3 2 2 2 2 Nanshi Jie station 6 5 5 5 5 5 5 5 4 4 4 4 4 3 3 3 3 3 2 2 2 2 Xingtang Jie station 6 6 5 5 5 5 5 5 5 4 4 4 4 4 3 3 3 3 2 2 2 2 2 Zhongnan Jie station
Rolling stock Fleet numbers Year built Time in service Builder Class Number in service No of car Assembly Rolling stock Number Depots Line assigned Notes 100 (25 sets) 2010-2013 2012-present CSR Nanjing Puzhen B 100 (25 sets) 4 Tc+Mp - Mp+Tc PM0K 010101-012504 (0101-0125) Tianping Depot During the 2023-2024 general overhaul, all cars installed LCD displays. 88 (22 sets) 2015-2017 2017-present CRRC Nanjing Puzhen B 88 (22 sets) 4 Tc+Mp - Mp+Tc PM087 012601-014704 (0126-0147) Tianping Depot