The following lists some of the larger power stations in Indonesia. Data are not included for a large number of small isolated plants (mostly diesel) in the Outer Islands. In total, the PLN operated over 5,000 plants across Indonesia in 2010 of which over 4,500 were small diesel plants outside of Java. For further details about existing capacity and operations of the electricity sector, see information about the state-owned Indonesian electricity company Perusahaan Listrik Negara.
Non-renewable
Thermal Thermal power is the largest source of power in Indonesia. There are different types of thermal power plants based on the fuel used to generate the steam such as coal, gas, diesel, etc. About 85% of electricity consumed in Indonesia is generated by thermal power plants.
Bituminous coal or lignite
Existing Note: IPP means independent power producer.
Power station Location District Province Region Coordinates Capacity per unit(MW) Installed capacity (MW) Operator Sector Notes Refs Bukit Asam coal-fired Tanjung Enim Muara EnimSouth Sumatra Sumatra 4 x 65 260 PT. PLN Government Boiler from Stein, turbines from Rateau and generators from GEC Alstom Paiton (PLN) coal-fired Paiton ProbolinggoEast Java Java-Bali 2 x 400 800 PT. PLN Government Boiler from ABB Combustion Engineering, turbines and generators from Toshiba Ombilin coal-fired Ombilin SawahluntoWest Sumatra Sumatra 2 x 100 200 PT. PLN Government Boiler from Stein, turbines and generators from GEC AlstomSuralaya coal-firedSuralayaCilegonBantenJava-Bali4 x 400 3 x 6003,400PT. Indonesia PowerGovernmentBoiler from Babcock & Wilcox Canada, turbines from MHI Japan; generators from Mitsubishi Electric Co. Suralaya Baru coal-fired Suralaya CilegonBanten Java-Bali 1 x 625 625PT. Indonesia Power Government Boiler from Shanghai Co. Ltd, turbines and generators from Shanghai Co. Ltd Paiton Paiton ProbolinggoEast Java Java-Bali 2 x 670 2 x 610 1 x 850 2,300 PT. Paiton Energy (IPP) Private Boiler supplied by ABB, turbines and generators supplied by GE Tanjung Jati-B I coal-fired Bangsri JeparaEast Java Java-Bali 2 x 662 1,320 PT. Central Java Power (IPP) Private Boiler supplied by Babcock & Wilcox, turbines and generators supplied by Toshiba Tanjung Jati-B II coal-fired Bangsri JeparaEast Java Java-Bali 2 x 662 1,320 PT. Central Java Power (IPP) Private Boiler supplied by Mitsubishi Heavy Industry, turbines and generators supplied by Toshiba Cirebon coal-fired Kanci Kulon CirebonWest Java Java-Bali 1 x 660 660 PT. Cirebon Electric Power (IPP) Private Boiler, turbines and generators supplied by Doosan Heavy Industries and Construction Co., Ltd. Cilacap Karangkandri CilacapCentral Java Java-Bali 2 x 300 600 PT. Sumber Segara Primadaya (IPP) Government Boiler supplied by Dongfang Electric Corp. Ltd, turbines and generators supplied by Dongfang Electric Corp. Ltd Cilacap Adipala coal-fired Adipala CilacapCentral Java Java-Bali 1 x 660 660 PT. Indonesia Power Government Boiler supplied by Shanghai Electric Corp. Ltd, turbines and generators supplied by Shanghai Electric Corp. Ltd Indramayu coal-fired Sumur Adem IndramayuWest Java Java-Bali 3 x 330 990 PT. PLN Government Boiler supplied by Babcock & Wilcox Beijing Co., turbines and generators supplied by Beijing Beizhong Pacitan coal-fired Sukorejo PacitanEast Java Java-Bali 2 x 315 630 PT. PLN Government Boiler supplied by Dongfang Electric Corp. Ltd, turbines and generators supplied by Dongfang Electric Corp. Ltd Tarahan coal-fired Tarahan South LampungLampung Sumatra 2 x 100 200 PT. PLN Government Boiler supplied by Jinan Co. Ltd, turbines and generators supplied by Wuhan Co. Ltd Labuan coal-fired Labuan PandeglangBanten Java-Bali 2 x 300 600PT. Indonesia Power Government Boiler supplied by Dongfang Electric Corp. Ltd, turbines and generators supplied by Dongfang Electric Corp. Ltd Labuhan Angin coal-fired Labuhan Angin Central TapanuliNorth Sumatra Sumatra 2 x 115 230PT. PLN Government Boiler supplied by Foster Wheeler, turbines and generators supplied by Shanghai Turbine Co. Ltd.Introduction to Indonesia Labuhan Angin 2X115MW CFB Power Plant Project Lontar coal-fired Lontar, Teluk Naga TangerangBanten Java-Bali 3 x 315 945PT. Indonesia Power Government Boiler supplied by Dongfang Electric Corp. Ltd, turbines and generators supplied by Dongfang Electric Corp. Ltd Pelabuhan Ratu coal-fired Pelabuhan Ratu SukabumiWest Java Java-Bali 3 x 350 1050PT. Indonesia Power Government Boiler supplied by Shanghai Electric Corp. Ltd, turbines and generators supplied by Shanghai Electric Corp. LtdShanghai Electric Suppliers of power plant equipment in Indonesia Rembang coal-fired Sluke RembangCentral Java Java-Bali 2 x 315 630 PT. PLN Government Boiler supplied by Dongfang Electric Corp. Ltd, turbines and generators supplied by Dongfang Electric Corp. Ltd Bangka Belitung 3 coal-fired Air Anyir BangkaBangka Belitung Sumatera 2 x 30 60 PT. BMP (IPP) Government Total 5018,630
Proposed or under construction Power station Location District Province Region Capacity per unit(MW) Installed capacity (MW) Operator Sector Remarks and plant coordinates Java 4 coal-fired Tubanan, Kembang Jepara Central Java Java-Bali 2 x 1000 2,000 PT. Bhumi Jati Power Private Java 4 Coal Power Station Will Operate In 2021 Java 7 coal-fired Kramatwatu Serang Banten Java-Bali 2 x 1000 2,000 PT. Shenhua Guohua Pembangkitan Jawa Bali Private Java 7 Coal Power Station Will Finish Faster Central Java coal-fired (by the end of 2016) Ujungnegoro BatangCentral Java Java-Bali 2 x 1000 2,000 PT. Bhimasena Power Indonesia Private Consortium J-Power, Ithocu and Adaro is the bid winner of PLTU Central Java 2x1000 MW Tanjung Awar-Awar coal-fired Kaliuntu TubanEast Java Java-Bali 2 x 350 700 PT. PLN Government Boiler supplied by Babcock & Wilcox Beijing Co., turbines and generators supplied by Beijing Beizhong Madura coal-fired PamekasanEast Java Java-Bali 2 x 100 200 PT. PLN Government Bojonegara coal-fired Bojonegara CilegonBanten Java-Bali 3 x 740 2,220PT. PLN Government Tanjung Jati-A coal-fired Cirebon CirebonWest Java Java-Bali 2 x 660 1,320 PT. Bakrie Power Private Nusa Penida coal-fired Nusa PenidaBali Java-Bali 2 x 100 200 PT. PLN Government Anyer coal-fired Anyer Banten Java-Bali 1 x 330 330 PT. PLN Government Kuala Tanjung coal-fired Kuala Tanjung South Sumatra Sumatra 2 x 112 224 PT. Ranyza Energi Private Banjarsari coal-fired Banjarsari LahatSouth Sumatra Sumatra 2 x 100 200 PT. Bukit Pembangkit Innovative Private Banyuasin coal-fired Banyuasin BanyuasinSouth Sumatra Sumatra 2 x 100 200 PT. Banyuasin Power Energy Private Baturaja coal-fired Baturaja Ogan Komering UluSouth Sumatra Sumatra 2 x 100 200 PT. Priamanaya Power Energi Private Simpang Belimbing coal-fired Gunung Raja Muara EnimSouth Sumatra Sumatra 2 x 150 300 PT. GH EMMI Private Arahan coal-fired Arahan Muara EnimSouth Sumatra Sumatra 4 x 600 2,400 PT. PLN Government Central Bangko coal-fired Bangko Tengah Muara EnimSouth Sumatra Sumatra 4 x 620 2,480 PT. BA & CHD (China) Private West Kalimantan 1 coal-fired Tanjung Gundul BengkayangWest Kalimantan Kalimantan 2 x 100 200 PT. GCL Indotenaga Government - private Tanjung coal-fired Tanjung TabalongSouth Kalimantan Kalimantan 2 x 55 110 PT. PLN Government Total 3417,264
Gas or liquid fuel Power station Location District Province Region Coordinates Capacity per unit(MW) Capacity (MW) Operator Sector Refs Bekasi West Java 130 Betara Lampung 70 Grati CCGT Grati PasuruanEast Java Java-Bali 3 x 100.75 GTPP; 3 x 100.75 SPP; 1 x 159.58 CCPP 764 PT. Indonesia Power Government Gresik CCGT Gresik GresikEast Java Java-Bali 4 x GTPP; 4 x SPP; 3 x CCPP 2,255 PT. Pembangkitan Jawa Bali Government Muara Tawar CCGT Tarumajaya BekasiWest Java Java-Bali 2 x GTPP; 3 x CCPP 920 PT. Pembangkitan Jawa Bali Government Muara Karang CCGT Muara Karang North JakartaDKI Jakarta Java-Bali 5 x STPP; 1 x CCPP 1,208 PT. Pembangkitan Jawa Bali Government Palembang Timur South Sumatra 150 PLTG SenipahSenipahKutai KartanegaraEast Kalimantan Kalimantan 2x 46 GTG92PT. Kertanegara Energi PerkasaIPPPLTG/MG Kalbar Peaker Parit Baru MempawahWest Kalimantan Kalimantan 100 100 PT. PLN Government 2019 Sengkang South Sulawesi 150 Tambak Lorok CCGT Tambak Lorok SemarangCentral Java Java-Bali 6 x 109.65 GTPP; 2 x 50 SPP; 1 x 200 SPP; 2 x 188 CCPP 1,334 PT. Indonesia Power Government Tanjung Priok CCGT Tanjung Priok North JakartaDKI Jakarta Java-Bali 2 x 26 GTPP; 2 x 48.8 GTPP; 2 x 50 SPP; 6 x 130 CCGT; 2 x 200 CCGT 1,430 PT. Indonesia Power Government Senayan DieselSenayanJakartaDKI JakartaJava-Bali -6.2160361, 106.79532576 x 2.5215PT. Indonesia PowerGovernmentPLTU 400 MWCiwandanCilegonBantenJava-Bali5 x 80 STG400 MWPT. Krakatau Daya ListrikSOEPLTGU 120 MWCiwandanCilegonBantenJava-Bali2 x 39 GTG; 1 x 43 STG120 MWPT. Krakatau Daya ListrikSOE Total 68 8,446
Renewable
Geothermal
Note: IPP means independent power producer.