Line 1 of the Beijing Subway () is the oldest and one of the busiest lines of Beijing's mass transit rail network. The line runs underneath Chang'an Avenue, the city's grand east–west thoroughfare, right through the heart of Beijing with stops on either side of Tiananmen Square. Line 1's color is dark red. Through operation with the Batong line started on August 29, 2021.
Ridership As the oldest line of the Beijing Subway, Line 1 was also the most heavily used from the time the subway opened in 1971 until January 2013, when the near-completion of the Line 10 loop caused ridership on that line to surge past Line 1. Daily ridership averaged 1,234,900 in 2014. Peak ridership in 2014 was 1,536,900.
Recent traffic relief efforts have been completed in recent years. The opening of the first phase of the parallel Line 6, caused an 8.46% decrease in daily demand and a 10-20% reduction in peak flow during rush hour. In addition Beijing BRT line 2 parallels the eastern section of Line 1. In the meantime between 2014 and 2015, Line 1 again upgraded its signals to a communications-based train control system allowing trains to run at headways as low as 1 minutes 45 seconds. However, during peak hours, sections of the line were reported in 2013 to still operate above 100% capacity.
Hours of operation The first east-bound trains departs from Gucheng at 4:58am and Pingguoyuan at 5:10am. The first west-bound train departs Sihui at 4:56am and Sihui East at 5:05am. The last east-bound train leaves Pingguoyuan at 10:55pm. The last west-bound train leaves Sihui East at 11:15pm.
Route Line 1's western terminus is , located in Shijingshan District. The line heads southeast to its second stop at Gucheng and from there runs straight east, following Chang'an Avenue all the way to its eastern terminus, in Chaoyang District, just beyond the 4th Ring Road. The line passes through Xidan, Wangfujing and Dongdan, among other important commercial centers of Xicheng and Dongcheng Districts, as well as the Beijing CBD near the China World Trade Center. The line is in length with 23 stations in operation. All stations except for and are underground.
Stations Station list for Line 1 and Batong line of Beijing Subway, after the through operation started on August 29, 2021.
History
The first section of subway in Beijing officially started trial operation on January 15, 1971. It was long and ran between Beijing railway station to , which today is a section of Line 1 and 2. A few months later, on August 15, 1971, the line was extended 3 stations west, to . The line was extended again to in November. On April 23, 1973, the line was extended , at this point the line is long with 17 stations. On September 15, 1981, the line was again extended westward to creating a long line with 19 stations. The line was transferred to the newly created Beijing Mass Transit Operation Corporation and was officially opened to the public, ending the decade long trial operation period. By 1981, the annual passenger volume of Beijing Subway was 64.66 million passengers, with a daily average of 177,000 passenger trips.
On August 15, 1986, the second phase of subway construction started and a feasibility study on the construction of the new line between of Fuxingmen to Bawangfen (Today's Beijing CBD) was carried out. A new branch heading east to a new station, , was completed between and stations on December 28, 1987. The section between and was transferred to the newly created Line 2 and Line 1 ran between Pingguoyuan and Fuxingmen stations. In January 1991, the feasibility study report on the construction of a new line between Fuxingmen to Bawangfen was approved with construction of the new "Fuba line", starting in June 1992. On December 12, 1992, Line 1 was extended east for one station to . In 1994, Line 1's signals were upgraded to automatic train protection system. On September 28, 1999, the first section of the Fuba line between to was opened. On June 28, 2000, the section between and stations opened, merging Line 1 and the Fuba Line to create a line with 23 stations.
SegmentCommencementLengthStation(s)Name Gongzhufen — Beijing Railway Station 15 January 1971 10 Phase 1 (initial section) Yuquan Lu — Gongzhufen 5 August 1971 3 Yuquan Lu extension Gucheng — Yuquan Lu 7 November 1971 3 Gucheng extension Pingguoyuan — Gucheng 23 April 1973 1 Pingguoyuan extension Nanlishilu — Fuxingmen 28 December 1987 1 Line 1 & 2 realignment project Changchun Jie — Beijing Railway Station -6 Fuxingmen — Xidan 12 December 1992 1 Xidan extension Tian'anmenxi — Sihuidong 28 September 1999 10 Fuba line Xidan — Tian'anmenxi 28 June 2000 2 Line 1 & Fuba line merging project
Headway Reduction Since 2014, the signaling and power systems has been gradually upgraded to allow for trains to run more frequently. The upgraded CBTC moving block signaling system in place today reduces rush hour headways from every 2 minutes and 5 seconds to 1 minute 45 seconds.
Platform screen doors
Due to platform congestion and suicides, a proposal was made in 2010 to refit all stations on Line 1 with platform screen doors. However, the ventilation system in the older stations of Line 1 was incompatible with full-height platform screen doors, so half height platform screen doors were chosen instead. 大众网 2010-07-04 In July 2016, the operator began installing platform screen doors on Line 1. In 2016, the platform screen doors was installed at Yong'anli station. By the end of 2017, all stations except were retrofitted with half-height platform screen doors, and all the screen doors were put into operation for the first time.
Through operations with the Batong line
In 2010, a CPPCC member Chen Dingwang, proposed that services on Line 1 and the Batong line should directly link, with through operations, reducing travel times and removing the unnecessary forced transfers at or . However, the Beijing Subway responded that Line 1's and Batong's signal systems are completely different, so through-operation will be more difficult to achieve, from an engineering standpoint. As of 2016, preliminary design and feasibility studies are underway to allow for through operations between Line 1 and Batong. On June 12, 2020, the project of the through operation of Line 1 and Batong line was approved by Beijing Development and Reform Commission. Through operation with the Batong line started on 29 August 2021.
Other facilities Rolling stock for Line 1 is parked and maintained at Gucheng Depot and Sihui Depot.
Restricted stations
Beyond , Line 1 extends further northwest where it has several other stations: Station 53 () and Fushouling (). Station 53 is in the military region. Fushouling station is outside the military region and originally opened for rapid train for Subway Technology College students nearby, but closed as rapid train terminated in 2007. These stations are not open for public use.
Fushouling station began to renovate in 2021 as part of Line 1 west extension plan, and as part of Fushouling Transit Terminal. The renovation of the station was completed in 2024, but the opening date is yet to be determined, due to delay of the construction of transit terminal, and potential impact of closure of Bajiao Amusement Park station due to Line 1 branch construction.
A proposal to open the Station 53 to public is mentioned within 2022 and 2023 working plan of the Shijingshan District.
Future Development Increasing capacity
Due to Line 1's severe overcapacity problem, there are plans to introduce 7-car or longer trains. In order for this plan to proceed the oldest section of Line 1 between and , which only has platforms long enough to accommodate 6-car trains, will need to be lengthened. The newer section between and , formerly known as "Fuba line" during construction, has platforms long enough for 8-car trains. According to an interview to the director of Beijing Municipal Transport Commission in December 2022, they will introduce 7-car trains in the eastern section of Line 1 and the Batong line in future. However, the plan was later delayed indefinitely after through service between Line 1 and Batong Line begins, and the difficulties of lengthening platforms in Batong Line, which also only able to accommodate 6-car trains.
Branch to Qinglonghudong On 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) mentions a proposal about the branch line of Line 1. The branch line is a southwest-to-northeast line starts from Qinglonghudong (located at the east side of Qinglong Lake, in Wangzuo Town, Fengtai District) to Bajiao Amusement Park in Shijingshan District. It will be in length with 9 new stations. Construction on the Line 1 branch began on January 18, 2024.
To facilitate construction of the extension, the project will need to renovate and expand Station. According to the second announcement of the environmental impact assessment of the Line 1 branch line project released in October 2023, this station will be a new platform for the branch line of Line 1, and the new platform will be combined with the existing Line 1 platform to form a separate island platform, so that the station will become a double-island station. Since June 2, 2025, the station was closed for this renovation work, and it is expected to reopen on May 3, 2027.
Station name ConnectionsLocation (Main line)ShijingshanFengtai
Rolling Stock
The line uses 6-car Type B rolling stock.
Current ModelImageManufacturerYear builtYear refurbishedAmount in ServiceFleet numbersDepot CRRC Changchun Railway VehiclesBeijing Subway Rolling Stock Equipment 20072010-20122015-20162020-2021 31 S401–S431(01 001–01 031) (except two in ) CRRC Qingdao SifangBeijing Subway Rolling Stock Equipment 2021 39 G432–G470(01 032–01 070) Gucheng 20082015-20202021 108 TQ401–TQ408, TQ415–TQ424(01 071–01 078, 01 085–01 094) Beijing Subway Rolling Stock Equipment 72 TQ431–TQ437 (01 101–01 107), 01 108–01 112 Tuqiao, Sihui BDK09 Beijing Subway Rolling Stock Equipment 1 Tuqiao, Sihui
Former All were based at Gucheng depot. ModelImageManufacturerYear builtYears in serviceNumber MadeFleet numbers (Before 1996)Fleet numbers (After 1996)Notes CRRC Changchun Railway Vehicles 1967 2 001–002 Test train, not for revenue service. 1969–1985 80 201–219 76 cars were refurbished into DK11. 1971–1973 1971-2002 50 G101–G107 Transferred to line 13 and Batong line. 1982 52 401–413 Transferred to line 2. 1984–1985 1984–2008 76 601–619 G201–G207, G2082–G2085, G209–G213 1994–1995 1994–2012 42 443–449 G108–G114 Originally retired in 2008, reactivated due to DKZ4 trains being overhauled. Beijing Subway Rolling Stock Equipment 1990–1992 1990–1994 18 3083–3084, 309–311 Transferred to line 2. 1994–1998 1995–2012 72 450–454 (first batch only) G115–G126 Originally retired in 2008, reactivated due to DKZ4 trains being overhauled. 1995 1996–2001 2 G2081, G2086 Coupled with DK11 cars G2082–G2085.
See also
Restricted stations of Line 1, Beijing Subway
Notes
References