Kong Sham Western Highway, formerly known as the Deep Bay LinkTuen Mun Western Bypass. Project Profile, Highways Department, November 2007. p.1 is a highway in Hong Kong. It is long and has three lanes in each direction. Its northern end is at Ngau Hom Shek, near Deep Bay, and its southern end is at Lam Tei, in Tuen Mun District. Together with the Hong Kong–Shenzhen Western Corridor, it forms the Route 10 of the Hong Kong Strategic Route and Exit Number System and provides road access from Hong Kong to the mainland. The link itself consists of 108,000 m2 of deck space over 3,014 segments.

History The road was built as initiative from the Crosslinks Further Study, which highlighted the need for another vehicular cross-border link between Hong Kong and Shenzhen. At the date of the study (2001), there were three existing vehicular border crossings, located at Lok Ma Chau, Man Kam To and Sha Tau Kok. At that time, these links were nearing saturation and were expected to reach their maximum handling capacity by 2006. As a result, the government of Hong Kong proposed the Shenzhen Western Corridor and Deep Bay Link as an additional vehicular border crossing to provide additional cross-border road infrastructure.

The Environmental Protection Department of the Government of Hong Kong carried out an environmental impact assessment, and found that the environmental impact of the Deep Bay Link and associated carriageways will not be significantly adverse. The assessment however noted that Deep Bay Link might cause localized environmental impact, further detailed in the Feasibility Study for Additional Cross-border Links. The Deep Bay Link was therefore given the necessary environmental permit from the department.

The link's approved project cost is HK$4,600 million. The construction began in June 2003, and was commissioned in July 2007. The construction of the carriageway was split into two parts; northern and southern sections. Gammon Construction (at that time incorporated as "Gammon Skanska Limited", partially named after Skanska, a co-owner of the company) was the principal contractor for the northern section, and built around of the carriageway. China State Construction joint venture was in charge of the southern section.

Interchanges

Kong Sham Western Highway Northbound exitsExit numberSouthbound exits continues on as Hong Kong–Shenzhen Western Corridor End Kong Sham Western Highway Start Kong Sham Western Highway Ha TsuenHa Tsuen RoadAll non-permit holders 1 Ha TsuenHa Tsuen Road no exit 3 Tuen Mun, KowloonYuen Long Highway Start Kong Sham Western Highway End Kong Sham Western Highway End of Route 10intersects with Yuen Long Highway

Landmarks The carriageway originates in the Lam Tei area, and passes through Ha Tsuen. Ling Lo Tsz, a Chinese temple, is accessible from a branch road off the carriageway.

It also passes through the Hung Shui Kiu/Ha Tsuen New Development Area.

See also List of expressways in Hong Kong