Line 15 of the Shanghai Metro is a north-south metro line in the city of Shanghai that opened on 23 January 2021. The line begins at in Baoshan District at its northern end, and terminates at in Minhang District at its southern end, via and . It will be in length and have 30 stations. The line is one of Shanghai Metro's new batch of high capacity fully automated and driverless lines along with Lines 14 and 18. The line is colored ivory on system maps.

History The line was originally scheduled to open by the end of 2020. However, on 24 December 2020, Shanghai Metro officials announced that the opening would take place in 2021, prior to the start of the Chinese New Year. Line 15 opened on January 23, 2021. station opened on June 27, 2021.

On January 19, 2021, there was a partial collapse in an under-construction Exit 9 of Zizhu Hi-tech Park station. There were no casualties at the scene, no impact on the surrounding environment, and no impact on the opening of Line 15.

<onlyinclude> <onlyinclude> <onlyinclude> ! colspan="7" style="text-align: center" bgcolor=# | |-bgcolor=#cccccc !Segment!!Commenced!!Opened!!Length!!Station(s)!!Name!!Investment |-bgcolor=#f5f0e7 |style="text-align: left;"| Gucun Park - Zizhu Hi-tech Park | 1 Jul 2014 || 23 Jan 2021 | | 29 |style="text-align: left;"| Phase 1 || rowspan="2"|¥47.683 billion |-bgcolor=#f5f0e7 |style="text-align: left;"| Guilin Road | || 27 Jun 2021 | Infill station | 1 |style="text-align: left;"| |- style= "background:#; height: 2pt" | colspan = "7" |

On May 20, 2021, according to the official announcement, due to the accumulation of water between and , Line 15 will operate at a speed limit, which is expected to be delayed for more than 25 minutes.Explanation on the obstructed operation of stagnant water in the section of Guilin Road Station (under construction) on Line 15 due to external construction. Shanghai Metro shmetro. 2021-05-20.

Controversy On 28 December 2011, the northern terminus of the line was shifted from station to an independent station called , located near Line 7 between Qihua and but with no direct interchange to Line 7. This has stirred controversy among residents over Line 15's already lack of convenient connections with other major subway lines such as Line 2 and Line 10. Planners reconsidered and extended Line 15 north of Jinqiu Road to connect with Line 7 at . In December 2019, the line was further revised to provide an interchange with Line 2 at station. However, there is still no interchange planned with Line 10, as the Line 15 station is located mid-way between and stations on Line 10.

Stations

Service routes

M - Mainline: ↔ C - Core: ↔ P - Peak: ↔ (only operating during working day peak) ● ●0.00.00Baoshan23 Jan 2021Underground island● ●3.093.094● ●1.214.307● ●1.005.309● ●1.406.7011Putuo●●●1.498.1913Underground side & island●●●0.708.8915Underground island●●● 1.6310.5218●●●1.4011.9221●●●0.6712.5923●●●1.4214.0225●●●0.8814.9027Underground side & island●●●1.4216.3229ChangningUnderground island●●● (via )1.3717.6932●●●1.7119.5035●●●0.8620.3637Minhang●●●1.4121.7739Xuhui27 June 2021●●●0.8622.644123 Jan 2021●●● 1.8624.5044●●●1.1625.6647●●●1.3627.0250●●●1.0428.0652●●● 0.7628.8254●●●1.5830.4057Minhang●●●1.1731.5759●●●1.3732.9462●●●0.9533.8964● 2.8036.6967● 2.6639.3571● 1.8741.2274 MinhangSouth extension under constructionexp 2027 FengxianReserved station South extension under constructionexp 2027

Important stations Future expansion A south extension to to connect up with Line 5 is under construction and is expected to open in 2027.

Station name change On December 26, 2000 Xinlonghua was renamed as (before line 15 began serving the station). Huajingxi station was recently changed to Jinghong Road station with the opening of the Airport Link Line.

Headways <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> ! colspan="5" style="text-align: center" bgcolor=# | |-bgcolor=# | colspan=2||| - || - || - |-bgcolor=#cccccc ! colspan=5 align=center|Monday - Friday (working days) |- |||7:20–9:20 || About 4 min and 53 sec || About 3 min and 45 sec || About 6 min and 40 sec |-bgcolor=#EFEFEF |Off-peak||9:20–16:30 || About 12 min || About 6 min || About 12 min |- |PM peak||16:30–20:00|| About 6 min || About 4 min and 45 sec || About 9 min |-bgcolor=#EFEFEF |Other hours|| After 20:00 | colspan=3 align=center|About 5 – 12 min |-bgcolor=#cccccc ! colspan=5 align=center|Saturday and Sunday (weekends) |- |Peak||7:00–20:20|| About 12 min|| About 6 min || About 12 min |-bgcolor=#EFEFEF |Other hours|| Before 7:00After 20:20 | colspan=3 align=center|6 – 12 min |- style= "background:#; height: 2pt" | colspan = "5" |

Technology

Signalling Line 15 is notable for being driverless and the longest line in China operating GoA4 (Grade-of-Automation 4), whereby trains may operate automatically at all times, including the actions of opening/closing doors, detecting obstacles and reacting to emergencies. There are no staff on board concerned with ongoing train operations.Nice One, Shanghai! Now Proud Owner of World’s Longest Metro

Between December 2020 and January 2021, SATEE supplied its OptONIX and ONIX metro traction systems for 324 metro cars of Shanghai Line 15, with support from Xi'an Alstom Yongji Electric Equipment Co. Ltd (XAYEECO). It was also responsible for the train control monitoring system (TCMS) of Shanghai Line 15, and the line's train electrical design. During the same period, CASCO has successfully put into service its Urbalis 888 signalling solution on six of these metro lines in Chengdu and Shanghai.

Rolling stock Fleet numbers Manufacturer Time of manufac-turing Class No of car Assembly Rolling stock Number Notes |-bgcolor=#ebe2cf | 324 || SATCO and CRRC Changchun Railway Vehicles || 2019-2020 || A || 6 || Tc+MP+M+M+MP+Tc || 15A01 || 15001-15054(150011-153241)|| Line 15||Front of the train adopts an open driver's cab.

Future rolling stock Fleet numbers Manufacturer Time of manufac-turing Class No of car Assembly Rolling stock Number Notes 180 TBA 2027-2028 A 6 Tc+MP+M+M+MP+Tc 15A02 15055-15084(153251-155041) <onlyinclude>