Line 15 of the Beijing Subway () is a rapid transit rail line in northern Beijing. Line 15's color is purple.

The line has a total length of across northern Beijing from Qinghua Donglu Xikou in Haidian District in the west, to Fengbo in Shunyi District in the east. The line uses Sparcs CBTC system supplied by Nippon Signal. It cost ¥17.6 billion. The line features 6-car trains similar to other lines in the Beijing Subway. Tunnels of Line 15 are up to underground, making them the deepest in Beijing's subway system. Trains run every 2–3 minutes during the rush hour with some trains performing express services. A journey on a local all stop train from Fengbo to Qinghua Donglu Xikou station takes about 60 minutes.

Route The line is long, with 20 stations, with 4 transfer stations at Wangjing (Line 14), Wangjingxi (Line 13), Datunludong (Line 5) and Olympic Park (Line 8). The line run from Qinghua Donglu Xikou in Haidian District to Fengbo in Shunyi District. Line 15 travels underground from Qinghua Donglu Xikou to Maquanying, and then goes above ground on an elevated track to Houshayu before returning underground and going underneath the Chaobai River to Fengbo. The elevated section is high enough to allow elevated roads to pass underneath. A major public venue on the Line 15 is the New China International Exhibition Center (New CIEC) at the China International Exhibition Center station. New CIEC holds the annual Beijing International Automotive Exhibition, which attracted 800,000 visitors in 2012.China Auto Show website: http://www.china-autoshow.com

List of stations Service Route Station Name Connections Nearby Bus Stops Distance LocationLRG ●●●0.0000.000Haidian●●●1.1441.144●●●1.3372.481●●●1.9994.480Chaoyang●●●1.3685.848●●●0.9386.786●●●1.0877.873●●● 2.0719.944●●●1.75811.702●●●1.65213.354●|●2.29515.649●|●2.00817.657●|●3.30920.966●|●3.38624.352Shunyi●|●1.61525.967●●●3.35429.321●●|4.57633.897●●| (Shunyi railway station)2.71236.609●●|1.33137.940●●●2.44140.381

History During planning of Line 15, the eastern terminus was moved from Fuqian Jie to the east bank of the Chaobai River. Construction began on Phase I of Line 15 in Shunyi District on April 11, 2009. At that time, Phase I of Line 15 was only long with 12 stations. According to the construction schedule in 2009, the easternmost Shunyi section of Phase I ( in length with seven stations) would be opened first on December 30, 2011. The remainder of Phase I would follow in May 2013.

The route of Line 15's Phase II has been revised several times over the years. In April 2009, Phase II plans showed the western half of Line 15 running from Xiyuan Station in Haidian District, through the campus of Tsinghua University, Zhongguancun, and the Olympic Green, and joining at Wangjingxi. When track-laying began in Phase I on October 28, 2009, the schedule and alignment of underwent a major revision, with one proposal extending Line 15 westward as originally planned with additional stations and another proposal sending Line 15 southward and parallel to Line 8 to provide relief for congested Line 4 and 5. Ultimately the route west to Qinghua Donglu Xikou was selected and the design of Xiyuan station leaves enough space to build another platform in between Line 4 and Line 16 platform for potential Line 15 extension westward beyond Qinghua Donglu Xikou. Additionally the construction schedule was revised with Phase I expanded from and 12 stations to and 18 stations. plans also underwent a revision; instead of two sections, Phase II would be built and opened in three sections.

The first section of , from Wangjingxi to Houshayu, opened on December 30, 2010. The second, from Houshayu to Fengbo, followed at the end of 2011. The third section, from Qinghua Donglu Xikou to Wangjingxi, opened on December 28, 2014.

On 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) announced the phase 2 of line 15, with 3.5 km long extension from Fengbo to Nancai.

Line 15 (Phase I) stations, from east to west: Section 1, opened Dec. 30, 2010Section 2, opened Dec 31, 2011Section 3, opened Dec 28, 2014 Houshayu 后沙峪 Hualikan 花梨坎 China Int'l Exhibition Center 国展 Sunhe 孙河 Maquanying 马泉营 Cuigezhuang 崔各庄 Wangjingdong 望京东* Wangjing 望京 (Line 14) Wangjingxi 望京西 (Line 13) Fengbo 俸伯 Shunyi 顺义 Shimen 石门 Nanfaxin 南法信 Guanzhuang 关庄 Datunludong 大屯路东** (Line 5) Anli Lu 安立路 Aolinpike Gongyuan (Olympic Park) 奥林匹克公园 (Line 8) Beishatan 北沙滩 Liudao Kou 六道口 Qinghua Donglu Xikou 清华东路西口  * Wangjingdong station did not open in 2010 due to lack of connections with the surrounding road system. It was opened on 31 December 2016.

** Datunludong station did not open in 2014 because the transfer corridors to Line 5 were still under construction. It was opened on 26 December 2015.

SegmentCommencementLengthStation(s)Name Wangjingxi — Houshayu 30 December 2010 8 Phase 1 (1st section) Houshayu — Fengbo 31 December 2011 4 Phase 1 (2nd section) Qinghua Donglu Xikou — Wangjingxi 28 December 2014 6 Phase 1 (3rd section) Datunludong 26 December 2015 Infill station 1 Wangjingdong 31 December 2016 Infill station 1

Rolling Stock ModelImageManufacturerYear builtAmount in serviceFleet numbersDepot DKZ31 CRRC Changchun Railway Vehicles 2010 28 15 001–15 028 MaquanyingFengbo On May 17, 2021, numerous BJD01 units of the Fangshan line were sent to Line 15. They have returned to the Fangshan line as of September 2022.