STS-110 was a Space Shuttle mission to the International Space Station (ISS) on 8–19 April 2002 flown by Space Shuttle Atlantis. The main purpose was to install the S0 Truss segment, which forms the backbone of the truss structure on the station.
Crew
Mission highlights
The main purpose of STS-110 was to attach the stainless steel S0 Truss segment to the International Space Station (ISS) to the Destiny Laboratory Module. It forms the backbone of the station to which the S1 and P1 truss segments were attached (on the following missions STS-112 and STS-113, respectively).
STS-110 also delivered the Mobile Transporter (MT), which is an (1,950 lb) assembly that glides down rails on the station integrated trusses. The MT was designed and manufactured by Astro Aerospace in Carpinteria, CA. During the next shuttle mission, STS-111, the Mobile Base System (MBS) was mounted to the MT. This Mobile Servicing System (MSS) allows the Canadarm2 to travel down the length of the installed truss structure.
Flight Day 1: Launch After a launch scrub on 4 April 2002 due to a hydrogen leak, Space Shuttle Atlantis successfully launched on 8 April 2002, from Launch Complex 39B. The countdown on 8 April encountered an unscheduled hold at the T−5-minute mark due to data dropouts in a backup Launch Processing System. The Launch Processing System team reloaded the required data and the countdown resumed. Liftoff occurred with 11 seconds remaining in the launch window.
STS-110 was the first shuttle mission to feature the upgrade Block II main engines, which featured an "improved fuel pump...a stronger integral shaft/disk, and more robust bearings". The intent of the upgrade was to increase the flight capacity of the engines, while increasing reliability and safety.
With the launch of Atlantis, mission specialist Jerry Ross became the first human to have traveled to space seven times.
Crew seat assignments Seat Launch Landing Seats 1–4 are on the flight deck.Seats 5–7 are on the mid-deck. 1 Bloomfield 2 Frick 3WalheimMorin 4 Ochoa 5 Morin Walheim 6 Ross 7 Smith
Spacewalks MissionSpacewalkers Start – UTCEnd – UTCDurationMission35. STS-110EVA 1 Steven SmithRex Walheim 11 April 2002 14:36 11 April 2002 22:24 7 h, 48 min Installed S0 Truss on Destiny36. STS-110EVA 2 Jerry RossLee Morin 13 April 2002 14:09 13 April 2002 21:39 7 h, 30 min Continued S0 Truss install37. STS-110EVA 3 Steven SmithRex Walheim 14 April 2002 13:48 14 April 2002 20:15 6 h, 27 min Reconfigure Canadarm2 for S0 truss38. STS-110EVA 4 Jerry RossLee Morin 16 April 2002 14:29 16 April 2002 21:06 6 h, 37 min Install future EVA hardware
Media
See also
List of human spaceflights List of International Space Station spacewalks List of Space Shuttle missions List of spacewalks and moonwalks 1965–1999 Outline of space science
References
External links
NASA mission summary NASA shuttle mission archive Status reports – Detailed NASA status reports for each day of the mission. STS-110 Video Highlights