Line 11 is a northwest–southeast line of the Shanghai Metro network. Its colour is maroon. Since October 2013, Line 11 also serves neighbouring Kunshan, making it the first interprovincial and the second intercity metro in China (after the Guangfo Metro). With a single-line mileage of , it is the third-longest single-line subway line in China, after Line 6 of Chongqing (85.6 km, 53.2 mi) and Line 7 of Wuhan (83.6 km, 51.9 mi).

History The line 11 was originally planned to be from Jiading to Nanhui New City, with a total length of , the south part of the line has been transferred to line 16.

The 1st phase of line 11, which runs from to , opened on 31 December 2009. A branch line from opened on 29 March 2010.11号线支线下周一试运营 , news.163.com. Retrieved 28 March 2010.

The 2nd phase runs from Jiangsu Road to . It opened on 31 August 2013.

The 3rd phase connects Luoshan Road and the . This section is long with three stations. All new stations except for the Disney Resort station opened on December 19, 2015. The Disney Resort started to trial operation on April 26, 2016.

From January 26, 2020 until March 24, the Kunshan section of line 11 ( to ) was suspended due to the COVID-19 pandemic.

On August 25, 2020, an infill station at was opened.

On February 14, 2022, the Kunshan section of line 11 was again suspended due to the COVID-19 pandemic. It was reopened on July 4, 2022.

On September 28, 2024, an infill station was opened.

<onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> ! colspan="7" style="text-align: center" bgcolor=# | |-bgcolor=#cccccc !Segment!!Commencement!!Opened!!Length!!Station(s)!!Name!!Investment |-bgcolor=#eec7cd |style="text-align: left;"| Jiangsu Road — North Jiading | 30 Dec 2005 | 31 Dec 2009 | | 16 |style="text-align: left;"| Phase 1 (main section) |rowspan=3| ¥18.95 billion |-bgcolor=#eec7cd |style="text-align: left;"| Jiading Xincheng — Anting | 30 Dec 2005 | 29 Mar 2010 | | 3 |style="text-align: left;"| Phase 1 (branch section) |-bgcolor=#eec7cd |style="text-align: left;"| East Changji Road | | 26 Apr 2011 | Infill station | 1 |style="text-align: left;"| |-bgcolor=#de909c |style="text-align: left;"| Luoshan Road — Jiangsu Road | 19 Dec 2008 | 31 Aug 2013 | | 12 |style="text-align: left;"| Phase 2 | ¥12.965 billion |-bgcolor=#eec7cd |style="text-align: left;"| Anting — Huaqiao | 27 Oct 2010 | 16 Oct 2013 | | 3 |style="text-align: left;"| Huaqiao extension | ¥1.849 billion |-bgcolor=#de909c |style="text-align: left;"| Kangxin Highway — Luoshan Road | 28 May 2013 | 19 Dec 2015 | | 2 |style="text-align: left;"| Disney extension (1st section) |rowspan=2| ¥4.371 billion |-bgcolor=#de909c |style="text-align: left;"| Disney Resort — Kangxin Highway | 28 May 2013 | 26 Apr 2016 | | 1 |style="text-align: left;"| Disney extension (2nd section) |-bgcolor=#de909c |style="text-align: left;"| Chenxiang Highway | | 25 Aug 2020 | Infill station | 1 |style="text-align: left;"| | |-bgcolor=#de909c |style="text-align: left;"| Kangheng Road | | 28 Sep 2024 | Infill station | 1 |style="text-align: left;"|

|- style= "background:#; height: 2pt" | colspan = "7" |

Controversy Due to the long length of line 11 and high passenger volumes, it is common for line 11 passengers to be forced to stand on the train for their entire trip. In response to this, in 2014, some passengers who travelled long distances between the urban area and the suburban areas of Jiading or Sanlin who could not bear standing for a long time started bringing their own folding seats into the carriages. Shanghai Metro said there is a safety hazard when sitting on personal benches. In the following years, the official Weibo of Shanghai Metro also reminded passengers of the phenomenon of "bench tribe" to be safe and civilized. Beginning in 2019, Line 11 posted relevant reminders in the carriages, and reminded passengers not to use their own benches in the carriages through the carriage broadcast.Shanghai line 11 warns the "bench family" for the first time: Do not use your own small bench in the carriage. Xinmin Evening News. 2019-02-20Xiong Yingqi. Passengers of Shanghai Metro Line 11 board the train with a bench and become a unique warning. Beijing Youth Daily. 2019-02-21.

Stations

Service routes

M - Mainline: ↔ B - Branch line: ↔ P - Partial mainline: ↔ (operates only during working day peak) C - Core: ↔ (operates only during AM peak) 0.000.000Pudong26 April 2016Underground island5.085.08519 Dec 2015Elevated side2.327.4081.789.181131 Aug 2013Elevated island2.5111.6914Underground island1.7313.421728 Sep 20241.4614.881931 Aug 2013Underground side1.5816.4621Underground island●●1.2117.6723Underground double island●● 3.1320.828Underground double island (shared with )●●2.1422.9431XuhuiUnderground island●●0.7623.7033●●1.0124.7135●●1.3926.1038●● 1.8527.9541●●0.8828.8343Changning●●2.0830.914631 Dec 2009●●1.3532.2649Putuo●● 0.9833.2451Underground double island●●0.8134.0553Underground island●●1.0535.1055Underground side & island●● 1.3536.4557Underground island●●1.4537.9060●●1.3539.2562●●1.3240.5765●●1.5942.1667●●3.1345.2971JiadingElevated side & island2.3647.657425 Aug 2020Elevated side3.4051.057831 De 20092.9053.9582Elevated side & island|1.8955.8484Jiading31 Dec 2009Elevated side|3.2959.1388Elevated island|1.9461.0791Elevated side 3.1564.2286Jiading29 March 2010Open-cut side 5.2769.499126 April 2011At-grade side 2.2571.749429 March 2010Elevated side 1.8473.5897Elevated island 1.1274.70100Kunshan, JS16 Oct 2013 3.2977.99104Elevated side (Suzhou Metro)1.2779.26107Passengers going to Huaqiao at Disney Resort Station, Kangxin Highway Station and Xiuyan Road Station during rush hour have to transfer at Jiading Xincheng Station.

Future expansions

Kangheng Road station Although station is part of the second phase of Line 11, it did not open with the other stations on August 31, 2013. Instead, it has been left as a reserved station under construction that will open in the future pending development in the area.上海市轨道交通11号线北段工程补充环境影响评价公示 It opened on 28 September 2024.

Station name change On May 7, 2011, Jiyang Road was renamed (before line 11 began serving the station).

Headways <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> <onlyinclude> ! colspan="6" style="text-align: center" bgcolor=# | |-bgcolor=# | colspan=2||| - & - || - || - || - |-bgcolor=#cccccc ! colspan=6 align=center|Monday - Friday (working days) |- |||7:30-9:00||Southbound: 6 - 10 minNorthbound: 7 min and 30 sec - 10 min || Southbound: 3 minNorthbound: 3 min and 45 sec || Southbound: 2 minNorthbound: 2 min and 30 sec || Southbound: 6 minNorthbound: 7 min and 30 sec |-bgcolor=#EFEFEF |Off-peak||9:00–17:00 || About 12 min || colspan=3 align=center|About 6 min |- |PM peak||17:00–19:00|| Southbound: 7 minNorthbound: 6 min || colspan=2 align=center|Southbound: 3 min and 30 secNorthbound: 2 min and 30 sec || Southbound: 7 minNorthbound: 6 min |-bgcolor=#EFEFEF |Other hours|| After 19:00 | About 12-18 min || colspan=3 align=center|About 5 – 7 min |-bgcolor=#cccccc ! colspan=6 align=center|Saturday and Sunday (weekends) |- |Peak||8:00–20:00|| 10 min|| colspan=3 align=center|About 5 min |-bgcolor=#EFEFEF |Other hours|| Before 8:00After 20:00 | About 10-12 min|| colspan=3 align=center|About 6-8 min |- style= "background:#; height: 2pt" | colspan = "6" |

Technology Rolling stock Fleet numbers Manufacturer Time of manufac-turing Class No of car Assembly Rolling stock Number Notes |-bgcolor=#eec7cd | 396 || CRRC Zhuzhou Locomotive Co., Ltd. || 2008-2011 || A || 6 || Tc+Mp+M+M+Mp+Tc || 11A01 || 1101-1166(110011-113961)|| Line 11|| Some of the trains are Disney-themed, and their inside and outside are packaged with Disney cartoon elements. Original name: AC16. |-bgcolor=#de909c | 36 || CRRC Changchun Railway Vehicles Co., Ltd. || 2015-2016 || A || 6 || Tc+Mp+M+M+Mp+Tc || 11A02 || 1167-1172(113971-114321)|| Line 11|| |-bgcolor=#eec7cd | 62 || CRRC Zhuzhou Locomotive Co., Ltd. || 2015-20162025 | A || 6 || Tc+Mp+M+M+Mp+Tc || 11A03 || 1173-1182(114331-114921)|| Line 11|| 114381 and 114372 were wrecked on December 22, 2024. They were replaced by two newly-built cars with same numbers in 2026.

Accident On 22 December 2024, a northbound 11A03 train (set 1173) hit the lifting arm of a tower crane which collapsed and fell towards the track between Chenxiang Highway station and Malu station. The train's head suffered serious damages and the train stopped. Shanghai Metro announced the service suspended between Wuwei Road station and Malu station.