The Approach and Landing Tests were a series of sixteen taxi and flight trials of the prototype Space Shuttle Enterprise that took place between February and October 1977 to test the vehicle's flight characteristics. Of the sixteen taxi-tests and flights, eleven saw Enterprise remain mated to the Shuttle Carrier Aircraft (SCA), while the final five had the shuttle separate from the SCA, with the on-board crew flying and landing the spacecraft.
Background
The Space Shuttle program originated in the late 1960s as an attempt to reduce the cost of spaceflight by introducing a reusable spacecraft. The final agreed design would feature a reusable spaceplane, a disposable external tank and reusable solid-fuel rocket boosters. The contract to build the spaceplane, which eventually came to be known as the "orbiter", was awarded to North American Rockwell (later Rockwell International), with the first complete orbiter rolled out in 1976. Originally planned to be named Constitution (due to its completion being in the year of the United States Bicentennial), a letter-writing campaign by Star Trek fans persuaded President Gerald Ford to change the name of the prototype to Enterprise. It was unveiled to the public on September 17, 1976, with several members of the Star Trek cast in attendance.
Test program Upon the orbiter's entry into service, NASA began an extensive program of tests using Enterprise to ensure all of the systems it had put in place for the Shuttle program functioned as designed. These tests would encompass not only the flight tests planned to test the flight characteristics of the orbiter, but also ground-based testing of the launch pad systems and procedures. In January 1977, Enterprise was taken by road from the Rockwell plant at Palmdale, California, to the Dryden Flight Research Center at Edwards Air Force Base to begin the flight test phase of the program, which had been christened by NASA as the Approach and Landing Tests (ALT).
Crews
The program lasted from February until October 1977, with a pair of two-man crews assigned to the orbiter:
Orbiter crew 1
Haise had previously flown as the Lunar Module pilot of Apollo 13, and was named as the commander of the original STS-2 mission. Fullerton later flew as the pilot of STS-3 and commanded STS-51-F.
Orbiter crew 2
This crew later flew on STS-2. Engle was originally a USAF pilot on the X-15, and had already gained Astronaut wings by the time he joined NASA. He flew his second Shuttle mission on STS-51-I. Truly flew his second Shuttle mission as commander of STS-8.
Shuttle carrier aircraft crew In addition to the two assigned Shuttle crews, who would alternate crewing the orbiter, a flight crew was attached to the Boeing 747 Shuttle Carrier Aircraft (SCA) for the entire program. This consisted of a captain and first officer, plus a pair of flight engineers:
Position Crew member Captain Fitzhugh L. Fulton, Jr. First officer Thomas C. McMurtry Flight engineer Louis E. Guidry, Jr. Flight engineer Victor W. Horton Flight engineer Vincent A. Alvarez Flight engineer William R. Young
ALT
The ALT program was divided into three phases.Space Shuttle Approach and Landing Tests Fact Sheet From "Space Shuttle Chronology"; Accessed 11/03/08
Taxi-test The "taxi-test" phase sought to verify the taxiing characteristics of the SCA while carrying the orbiter. On February 15, 1977, the SCA performed three taxi tests at Edwards Air Force Base, hauling the uncrewed, unpowered orbiter around on the ground.
Captive flights The captive flight phase of ALT served as a test of the SCA's flying characteristics while mated to the orbiter, and an initial test of the orbiter systems in flight. It was divided into two sub-phases:
Captive – inert Five captive-inert flights tested the flight and handling characteristics of the aircraft while it was mated to the orbiter. No tests were performed aboard the unpowered, uncrewed orbiter.
Captive – active The captive-active flights were intended to determine the optimum profile required for Enterprise to separate from the SCA during the orbiter's free flights. These were also intended to refine and test the orbiter crew procedures and to ensure the operational readiness of the orbiter's systems. For these three flights, although Enterprise remained mated to the SCA, it was powered and crewed.
Free-flight
The final phase of flight testing involved free flights. The SCA flew Enterprise to a launch altitude, then released it to glide to a landing at Edwards AFB. The intention of these flights was to test the flight characteristics of the orbiter itself, on a typical approach and landing profile from orbit.
For the approach and landing tests, a nose strut longer than those employed in later ferry flights increased the shuttle's angle of attack relative to the 747. Before the orbiter was released, the 747 engines were set to full power and the paired aircraft entered a shallow dive. Increased air speed combined with the shuttle's higher angle of attack generated enough differential lift so that the shuttle was effectively supporting the 747. Load cells on the three attachment points monitored the forces, informing the crew when the attachments were in sufficient tension. The mechanical connection between the two aircraft was then severed by explosive bolts and the shuttle essentially dropped the 747. The shuttle crew reported feeling an upward lurch on separation. The two aircraft then turned in opposite directions to maximize separation. The shuttle executed some more turns to evaluate its handling and glided to a landing.
There were a total of five free-flights between August and October; the first three saw Enterprise remain fitted with its aerodynamic tail cone, intended to reduce drag when mounted on the SCA during flight. The final two had the tail cone removed, with the orbiter in its full operational configuration, with dummy main engines and OMS pods. Enterprise used an air data probe mounted on its nose for these flights. These five flights were to be the only time Enterprise flew alone.
After flying missions on Columbia (STS-2) and Discovery (STS-51-I), Engle reported that the flight and handling characteristics of the operational orbiters were similar to those of Enterprise, except that he had to fly a steeper profile with the prototype, as it was much lighter than the operational spacecraft."Joe H. Engle", NASA Johnson Space Center Oral History Project, June 3, 2004.
Ferry flights After the free-flight tests, Enterprise was prepared for ferry flight tests, which were intended to ensure that the SCA/orbiter configuration was viable for flights of the duration between landing and launch sites.Astronautix.com Accessed 11/03/08
List of ALT flights
Mission Test flight Date Speed Altitude Shuttle crew SCA crew Duration Comment Full flight Shuttle flight ALT-1 Taxi test #1February 15, 1977 Taxi NoneFulton, McMurtry,Horton, Guidry Taxi Concrete runway,tailcone on ALT-2 Taxi test #2 ALT-3 Taxi test #3 ALT-4 Captive-inert flight #1 February 18, 1977 16,000 ft4,877 m 2 h 5 minN/ATailcone on,landed with 747 ALT-5 Captive-inert flight #2 February 22, 1977 22,600 ft6,888 m 3 h 13 min ALT-6 Captive-inert flight #3 February 25, 1977 26,600 ft8,108 m 2 h 28 min ALT-7 Captive-inert flight #4 February 28, 1977 28,565 ft8,707 m 2 h 11 min ALT-8 Captive-inert flight #5 March 2, 1977 30,000 ft9,144 m 1 h 39 min ALT-9 Captive-active flight #1A June 18, 1977 14,970 ft4,563 m Haise, Fullerton 55 min 46 s ALT-10 Captive-active flight #1 June 28, 1977 22,030 ft6,715 m Engle, TrulyFulton, McMurtry,Guidry, Young 62 min 0 s ALT-11 Captive-active flight #3 July 26, 1977 30,292 ft9,233 m Haise, FullertonFulton, McMurtry,Horton, Alvarez 59 min 53 s ALT-12 Free flight #1 August 12, 1977 24,100 ft7,346 m Haise, FullertonFulton, McMurtry,Horton, Guidry 53 min 51 s 5 min 21 sTailcone on,lakebed landing ALT-13 Free flight #2 September 13, 1977 26,000 ft7,925 m Engle, Truly 54 min 55s 5 min 28 s ALT-14 Free flight #3 September 23, 1977 24,700 ft7,529 m Haise, Fullerton 51 min 12 s 5 min 34 s ALT-15 Free flight #4 October 12, 1977 22,400 ft6,828 m Engle, Truly 67 min 48 s 2 min 34 sTailcone off,lakebed landing ALT-16 Free flight #5 October 26, 1977 19,000 ft5,791 m Haise, Fullerton 54 min 42 s 2 min 1 sTailcone off,runway landing
After ALT
After the flight test program, Enterprise was taken for testing with the external tank and SRBs in full-up launch configuration, to test both the structural responses of the "stack" itself and the launch procedures before the entry into service and first launch of the first operational orbiter. Enterprise was taken to the Dynamic Structural Test Facility at the Marshall Space Flight Center in Huntsville, Alabama, where the complete stack was subjected to vertical ground vibration tests, assessing the structural responses to a number of scenarios. Then the orbiter was flown to the Kennedy Space Center in Florida, to test the procedures of assembling the stack in the Vehicle Assembly Building, transporting it from the VAB to the launch pad, and to fit-check the facilities and procedures at LC-39 to be used in launching the Shuttle.