The Seattle–Tacoma Shipbuilding Corporation (later renamed Todd Pacific Shipyards, Inc.) was an American shipbuilding company which built escort carriers, destroyers, cargo ships and auxiliaries for the United States Navy and merchant marine during World War II. It consisted of two yards, one in Seattle and one in Tacoma, along the Puget Sound of Washington. It was the largest producer of destroyers (45) on the West Coast and the largest producer of escort carriers of various classes (56) of any United States shipyard active during World War II.
History Predecessor shipyards The William H. Todd Corporation, just having established itself in New York, acquired the Seattle Construction and Drydock Company (formerly the Moran Brothers shipyard) in the Seattle Harbor during World War I in 1916. The yard was acquired in 1918 by Skinner & Eddy, which had quickly risen to become a major force in Northwest Pacific shipbuilding. Todd moved his Seattle operation to nearby Harbor Island where a repair facility was constructed. In 1917 the company also set foot in Tacoma, where the first work on facilities of an entirely new yard was underway in January 1917 and the first ship, the Tacoma, was launched on March 28, 1918.
3 of 10 light cruisers and 23 cargo ships of 7,500dwt were built in the Tacoma yard (including , which survived till at least 1971), the and the N-class submarines , and as well as 14 cargo ships of mostly 7,500dwt also were built in Seattle.
In addition to the government contracts, the Tacoma yard built 2 cargo ships (named Red Hook and Hoboken after 2 of Todd's New York Harbor locations), 1 diesel freighter, 2 passenger ships and 6 barges. The Red Hook found its way into Imperial Japanese Army service as Naruo Maru and was sunk in 1944.
Shipbuilding ceased in the Seattle yard in 1920 and in the Tacoma yard in 1924.
Seattle–Tacoma Shipbuilding Corporation In 1939, the old Tacoma shipyard in Commencement Bay was revived (from scratch) by the Todd Shipyards Corporation and Kaiser Shipbuilding, initially with two slipways. With the aid of some $15 million in capital provided by the U.S. Government, this was eventually increased to eight.
Following the enactment of the Two-Ocean Navy Act, Seattle-Tacoma was awarded contracts to build 25 destroyers. The government invested $9 million in a new destroyer construction facility on Harbor Island which was then built starting October 15, 1940Pacific Marine Review, February 1941, p. 55 (includes photograph of the yard on December 31) next to the existing repair dock founded in 1918.
In February 1942, Todd bought out Kaiser's holding and sold the company's own interests in Permanente Metals.
Todd Pacific Shipyards In June 1944, the Seattle-Tacoma Shipbuilding Corporation was renamed Todd Pacific Shipyards, Inc., which existed as a legal entity until November 1946. Todd sold the Tacoma shipyard to the Navy after the war ended, which in turn sold the site to the Port of Tacoma in 1959. The Seattle division at Harbor Island resumed building new vessels in 1952.
The "Plant A" destroyer facility produced a single civilian ship, the luxury ferry Chinook, launched in 1947, but by 1952 oil terminals had been established in the spot.
The original repair yard continued to be part of the Todd Corporation, now building new civilian and military ships and it remains active to this day as a facility of Vigor Marine Group.
Ships built
Tacoma yard
In Commencement Bay ()
Escort carriers (56)
37 of 45 s (C3-S-A1) several were completed / fitted out at Willamette Iron and Steel Works, Portland, Oregon 19 of 19 s ... 3 completed at Commercial Iron Works in Portland, Oregon (CVE-110, CVE-126, CVE-121) 1 completed at Willamette Iron and Steel Works in Portland, Oregon (CVE-108)
Auxiliaries (14)
2 of 2 s (C3-S1-A3) , ordered October 23, 1940The Log, November 1940, p. 6 4 of 4 s (C3 Mod.) ... 5 of 23 s (T1-MT-M1) ... 3 of 6 s , ,
Cargo (5)
5 of 95 C1-B (5 of 10 diesel variant C1-B)The Log Vol 35, No. 5, August 1940, p. 6The Log Vol. 36, No. 1, October 1940, p. 6The Log Vol. 36, No. 9, June 1941, p. 5The Log Vol. 36, No. 10, July 1941, p. 49 ordered: 10 September 1939 first keel laying on 5 March 1940 (MC-119) launched August 1, 1940, delivered to American Mail Lines April 3, 1941 (MC-120) launched September 28, 1940, delivered to American Mail lines May 29, 1941 Cape Cleare (MC-121) launched November 29, 1940, renamed , delivered to Pacific-Atlantic Steamship Corporation, sunk 1941 (MC-122) launched April 11, 1941 Cape Douglas (MC-123) launched June 10, 1941, renamed delivered to Pacific-Atlantic Steamship Corporation 2 Hooven-Owens-Rentschler 6-cylinder diesel engines with magnetic coupling and single reduction gears (2.55:1) 2 Washington Iron Works auxiliary diesels
Ships of World War II produced before 1924 (incomplete)
– torpedoed November 1942 on Atlantic convoy duty (SC 107) Empire Wagtail – torpedoed December 1942 on Atlantic convoy duty (ON 154) – torpedoed September 1941 on Atlantic convoy duty (SC 42) – torpedoed off the coast of Virginia April 1942 – sunk by aerial torpedo as part of an Italian convoy El Coston Empire Mallard Empire Tiger Empire Elk – survived Willimantic (built in Seattle) Empire Gazelle – survived
Description of the plant as of January 1940: Photograph of the plant in the initial 2-ways stage (launch of the Cape Alava):
Seattle yard
on Harbor Island () in 2 separate facilities at the north end of the island. In 1918 Todd moved out of the seattle waterfront and opened a repair facility on the northwestern corner. In 1940 additional slipways were added on the northeastern end. The expansion had all 5 building ways upon initial completion (2 destroyers each).Pacific Marine Review, February 1941, p. 55 In June 1945, 5 destroyers were building, the unfinished was about to be laid down and 2 destroyer tenders ( and - eventually aborted) were using up 1 full slipway each.
Although the Seattle yard produced the largest number of destroyers on the West Coast, Union Iron Works was slightly more productive overall with 4 s, 9 s, 18 Fletchers, 6 Sumners, 3 Gearings and 12 s.
Contracts awarded
NOD1502 7/40 destroyers $29,406,000 (= 5 Gleaves) NOD1511 9/40 destroyers $109,726,000 (= 15 Fletcher) NOD1502S 12/40 destroyers $29,406,000 (= 5 Gleaves) NOD1760 3/41 gasoline tankers aog $10,700,000 (= 5 Patapsco, built in Tacoma) OBS315 8/42 destroyers $40,799,000 (= 6 Fletcher) OBS329 8/42 destroyers $107,535,000 (= 15 Sumner) OBS10215 8/44 ship repairs $2,081,000 total: $329,653,000
45 of 415 destroyers
10 of 66 (May 1, 1941 - September 7, 1942) ... ... 21 of 175 (March 8, 1942 - June 6, 1944) ... ... 5 of 58 (as Todd Pacific according to some sources)Friedman, US destroyers, p. 449 ... 9 of 98 (as Todd Pacific according to some sources)Friedman, US destroyers, p. 450 ... 1 additional, , was launched incomplete and never commissioned
1 of 6 s
- canceled incomplete
Pacific Reserve Fleet, Tacoma After the war the United States Navy took over the Seattle-Tacoma Shipbuilding shipyard and for use as part of the United States Navy reserve fleets, also called a mothball fleet. The Pacific Reserve Fleet, Tacoma was used to store the now many surplus ships after World War II. Some ships in the Commencement Bay Reserve Fleet were reactivated for the Korean War. The Navy sold the shipyard to the Port of Tacoma in 1959. The ships stored at Pacific Reserve Fleet, Tacoma were either scrapped or moved to other reserve fleets.
Example ships: was placed in the Pacific Reserve Fleet, Tacoma in 1946 and removed in June 1955 and recommissioned as CVU-94. was placed in the Pacific Reserve Fleet, Tacoma in 1946 and removed in June 1955 and recommissioned as CVU-98 a utility aircraft carrier. , a Commencement Bay-class escort carrier, was stored at Reserve Fleet, Tacoma, being completed in 1946, too late for World War II. On June 12, 1955, the ship was reclassified as an escort helicopter aircraft carrier and re-designated CVHE-123.
See also Boeing Plant 2 – located a few miles upstream the Duwamish River Pacific Reserve Fleet, Bremerton
References
Further reading
External links
Todd Pacific Shipyards Incorporated Tacoma WA WWII construction record. Seattle-Tacoma Shipbuilding Corporation, from the Destroyer History website. Ships built at Todd Dry Dock, Seattle-Tacoma, and Todd Pacific at ShipbuildingHistory.com https://shipbuildinghistory.com/shipyards/large/toddseattle.htm