The Southampton–Fareham line is a railway line in England, along the south coast of Hampshire. As a through line it came late in British Railway history, traversing unpromising coastal terrain. The first part from Portswood, near Southampton, to Netley was opened in 1866, prompted by the establishment of the Royal Victoria Hospital at Netley, which had been established for the care of wounded soldiers.

The second stage was the continuation from Netley to Fareham, forming a though route, in 1889. Fareham was already connected with Portsmouth, so by this means, a through route from Southampton to Portsmouth was created.

In 1990 the line was electrified, and the passenger train service pattern was changed, with many more trains taking advantage of the Farlington Junction to Cosham chord, to run direct from Havant to Fareham avoiding Portsmouth. The line continues on that basis at the present time.

History Previous railways

The London and Southampton Railway had opened its line in 1840R A Williams, The London and South Western Railway: volume 1: The Formative Years, David & Charles, Newton Abbot, 1968, , page 40 and then in 1841 gave Portsmouth a half-hearted railway connection at Gosport, requiring a ferry crossing and a roundabout route to get to London. Changing the company name to London and South Western Railway (LSWR) did not completely erase the tension between the citizens of Portsmouth and Southampton.Williams, volume 1, page 122

The Gosport branch was from a junction on the main line at Bishopstoke, later renamed Eastleigh. The next built a railway to reach Portsmouth more directly, but curving round the head of Portsmouth Harbour. Fierce competition with the London, Brighton and South Coast Railway (LBSCR) made collaboration difficult for a time, but it was agreed to build a joint railway on Portsea Island.Williams, volume 1, page 139 The built a branch from Fareham, on the Gosport line, to Cosham, and the built from there to Portsmouth and made that section joint. These lines, connecting Fareham and Portsmouth, and Fareham and Havant, opened in 1848.J T Howard Turner, The London, Brighton and South Coast Railway, volume 1: Origins and Formation, B T Batsford Ltd, London, 1977, , pages 236 and 237

There was a great deal of territory on the coast between Fareham and Southampton, but it seemed to be of limited commercial value, and for some years ideas of a railway through it were discouraging.R A Williams, The London and South Western Railway: volume 2: Growth and Consolidation, David and Charles, Newton Abbot, 1973, , pages 130 to 134 Passenger and goods transport between Southampton and Portsmouth was swifter and more convenient by coastal shipping.Edwin Course, The Railways of Southern England: Secondary and Branch Lines, B T Batsford Ltd, London, 1974, , page 98

Netley Hospital established

In 1863 the Victoria Military Hospital was constructed at Netley; it was built for the treatment and recuperation of maimed soldiers.J R Fairman, Netley Hospital and its Railways, Kingfisher Railway Productions, 1984, , page 16 The patients often arrived in considerable numbers in special hospital trains, and many of them were not ambulatory. Moreover, in those days large hospitals needed some reliable transport connection to bring in consumables – foodstuffs and coal, and personnel. A small village grew in the area, housing staff and their families. In September 1859 a proposal to connect the hospital with Bishopstoke was turned down by the . An independent parliamentary bill the following year proposed a Southampton and Fareham line, but it depended on the co-operation of the at both ends, and when this was withheld, the proposal collapsed. It was suspected by the board that the London, Brighton and South Coast Railway were supporting the scheme, intending to get access for themselves to Southampton.

Nevertheless, the idea did not go away, and in 1861 the Southampton and Netley Railway obtained an authorising act of Parliament, the (24 & 25 Vict. c. ccxx) on 1 August 1861; authorised share capital was £48,000.Ernest F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959, page 321Donald J Grant, Directory of the Railway Companies of Great Britain, Matador, Kibworth Beauchamp, 2017, , page 517 As it did not form a through route, the sensitivity regarding the was not an issue. The route was constrained by the need to cross the River Itchen from the Southampton area; a convenient place was found north of Northam Bridge. The line was to run from a junction at Portswood, a few miles north of Southampton (Docks) station on the London main line. A new Portswood station was built at the junction; its name was later changed to St Denys.Course, Secondary and Branch Lines, pages 98 to 103

Authorisation of the Southampton and Netley line

The Southampton and Netley Railway Company was independent, but the authorising act permitted the to subscribe up to £5,000 and make working arrangements. Although it was prepared to do so, the still suspected bad faith, believing that the line was a speculative scheme intended to extort money from them, rather than a genuine attempt to construct a railway. Notwithstanding this suspicion, the later decided to acquire the company, as the alternative was that it might fall into the hands of a competitor, probably the . At this stage the had not built any railway.

Having purchased the company, the naturally installed its own nominees as directors; this was done in 1863; a new (27 & 28 Vict. c. clxxiii) of 14 July 1864 and the South-western Railway (Various Powers) Act 1864 (27 & 28 Vict. c. ccxxvii) of 25 July 1864 made 1 January 1864 the amalgamation date: the took on liability for loans and other liabilities at that time.

The line was not extensive at five miles in length, and work proceeded swiftly; the biggest construction by far was a three-span viaduct over the River Itchen, 115 yards long. Caissons had been sunk to prodigious depths to find firm ground. The viaduct cost about £14,500.

Captain Tyler of the Board of Trade carried out an inspection of the completed works on 22 February 1866; the line passed the inspection and it opened on 5 March 1866 without ceremony.H P White, A Regional History of the Railways of Great Britain: volume II: Southern England, Phoenix House, London, 1961, page 125 It was worked by train staff and ticket, with eight weekday trains daily each way, three on Sundays. The journey time from Southampton Docks station was 23 minutes; intermediate stops were Portswood (renamed St Denys from 1876) on the main line, then at Bitterne Road (renamed Bitterne in 1896), Woolston and Netley on the new line. It was not until 1883 that a direct siding connection was made from Netley station to the hospital; the War Office was charged interest on the capital outlay of the extension.

Continuation to Fareham

There was now an obvious gap between Netley and Fareham, and a company was promoted to close it: the Company got powers in the (28 & 29 Vict. c. cliii) on 29 June 1865, share capital £105,000, to extend from the line across the River Hamble by a swing bridge, to join the from the south at Fareham station.Donald J Grant, Directory of the Railway Companies of Great Britain, Matador, Kibworth Beauchamp, 2017, , pages 198 and 199Carter, page 371 Spur connections would be provided at Fareham to connect directly to the Cosham line and the Gosport branch. However the project made no progress, and on 19 March 1878 the Board of Trade authorised abandonment.

In October 1882 the was approached on behalf of the Duke of Cambridge, as Commander-in-Chief of the Forces requesting it to extend the Netley line to Fareham; there was thought to be military advantage in such a connection. Accordingly, the promoted a line from Netley to Fareham taking a more northerly route than the earlier scheme and entering Fareham station from the north. The line was to be a little under 8 miles in length. The line was authorised by the South Western Railway (Various Powers) Act 1883 (46 & 47 Vict. c. clxxxix) obtained on 20 August 1883. As with the line from Portswood, this section of line was constrained by a river crossing, in this case of the River Hamble.

A contract was let to Henry Lovatt for £78,674; the first sod was cut early in April 1886, and work proceeded rapidly. The Hamble viaduct was 190 yards in length on a 30 chain curve, with six 95 foot spans. Fareham station was enlarged. The line opened to the public on 2 September 1889 without ceremony. At first, seven passenger and one goods train ran daily each way.Carter, page 471

The line was single track, with crossing stations at Bitterne Road, Netley (on the earlier line) and Swanwick; and there were also stations at Woolston, Sholing and Bursledon. The line between St Denys and Netley cost over £164,000, and the Fareham extension more than £231,000. The hoped-for residential development did not come in the nineteenth century.

Netley Hospital branch line The Royal Victoria Hospital at Netley was opened on 11 March 1863 to accommodate military patients returning from overseas service. A landing stage made access from the water easy, but by land the hospital was about three-quarters of a mile from Netley station, which opened on 5 March 1866. A special hospital platform was provided on a siding by Hound Road at the eastern end of the goods yard, but was far from satisfactory as it was unroofed until 1898 and without a waiting room until 1899.Colin G Maggs, Branch Lines of Hampshire, Amberley Publishing Plc, Stroud, 2010, , pages 134 and 137

That year the War Department asked the to lay a branch line to the hospital, of just over half a mile in length. It had steep gradients rising at 1 in 70 (1.43%) towards the main line, and it proved difficult to work, especially in autumn when the rails were damp and covered with fallen leaves from overhanging trees. The line opened on 18 April 1900 and the first two trains arrived on 23 April with casualties from the Battle of Ladysmith. The flat-bottomed rails were spiked directly to the sleepers. A 196-foot-long covered platform was connected to the hospital by a covered way. A small ticket office was staffed, when required, by Netley station personnel. Later in 1900 a siding was laid at the hospital to stable five ambulance coaches in a corrugated iron shed. The hospital's steam supply was used to pre-heat them before use.

Between 24 August 1914 and 31 December 1918 approximately 1,200 hospital trains arrived at Netley. Each Tuesday and Friday a train left with discharged patients. Immediately prior to the Second World War rail movements on the hospital line averaged about five a year. During the war, very few hospital trains arrived at Netley until 1944, by which time it had been taken over by the American authorities. In order to use heavier locomotives, the track was relaid with good second-hand bullhead rails on fresh ballast. Following D-Day, casualties were brought by road but, when treated and fit to travel, were moved by ambulance trains to other hospitals for further treatment and convalescence. In June and July 1944, up to five fourteen-to-sixteen-coach trains left Netley Hospital daily with an engine at each end. Wet rails, combined with the steep gradient, could cause the trip up to the main line to take as long as forty-five minutes on occasions. The last train over the line was on 30 August 1955, when 700 class 0-6-0 No 30350 hauled out the remaining ward cars.Edwin Course, The Railways of Southern England: Independent and Light Railways, B.T. Batsford Ltd, London, 1976, , page 126

Double track Double track was provided on the entire main line from St Denys to Fareham in 1910.

Hamble Airfields