Dinorwic quarry ( ; ; also known as Dinorwig quarry) is a large former slate quarry, now home to the Welsh National Slate Museum, located between the villages of Llanberis and Dinorwig (formerly Dinorwic) in Wales. At its height at the start of the 20th century, it was the second largest slate quarry in Wales (and thus, the world), after the neighbouring Penrhyn quarry near Bethesda.Jones, R. Merfyn. 1981. The North Wales quarrymen, 1874-1922, Studies in Welsh history 4. University of Wales Press; Dinorwic covered consisting of two main quarry sections with 20 galleries in each. Extensive internal tramway systems connected the quarries using inclines to transport slate between galleries. Since its closure in 1969, the quarry has become the site of the National Slate Museum, a regular film location, hiking location, and an extreme rock climbing destination.

History

The first commercial attempts at slate mining took place in 1787 when a private partnership obtained a lease from the landowner, Assheton Smith. Although this was met with moderate success, the outbreak of war with France, taxes, and transportation costs limited the development of the quarry. A new business partnership led by Assheton Smith was formed on the expiry of the lease in 1809 and the business boomed after the construction of a horse-drawn tramway to Port Dinorwic in 1824.

At its peak in the late 19th century, "when it was producing an annual outcome of 100,000 tonnes", Dinorwic employed more than 3,000 men and was the second-largest opencast slate producer in the country. Although by 1930 its working employment had dropped to 2,000, it continued in production until 1969.

Quarrying

The slate vein at Dinorwic is nearly vertical and lies at or near the surface of the mountain, allowing it to be worked in a series of stepped galleries. This is however not quite how the quarry developed.

The first quarrying was spread across several sites: Adelaide, Allt Ddu, Braich, Bryn Glas, Bryn Llys, Chwarel Fawr, Ellis, Garrett, Harriet, Matilda, Morgan's, Raven Rock, Sofia, Turner, Victoria, and Wellington.G.A.S. Vanol 4190 This was a situation that lasted for many years, certainly until the mid-1830s.

The 1824 railway brought transport problems. Produce from the upper quarries was not a problem, but Wellington, Ellis, Turner, Harriet, and Victoria quarries were all below the level of the railway. This was a problem solved in the 1840s when the lake level railway was built, and the quarry as we know it began to take shape.

Adelaide quarry became a part of Allt Ddu, and Chwarel Fawr and Chwarel Goch became linked to it too. In the 'Great New Quarry', Raven Rock and Garret Quarries became one massive quarry, operating as an open hillside gallery quarry, with the lowest two levels being accessed by tunnels. Harriet, Morgans, and Sofia quarry are all still identifiable as separate pits today, whilst Braich quarry became a large working of three contiguous smaller pits. Below this, The galleries of Victoria and Wellington were joined along the hillside and continued downwards in two separate main workings: Wellington and Hafod Owen. Each was eventually to contain several small sinks too, some below lake level. The current form of the quarry is little different from that of the time of the Great War, save for enlarging of the actual quarry faces and deepening of the sinks. Certainly, all the main inclines were in place, very little was altered until closure.Ordnance Survey Caernarvonshire 25" plan 1914

The nearby Marchlyn quarry was opened in the 1930s to provide access to the main slate vein higher up the mountain.

Closure The quarry closed in July 1969, the result of industrial decline and difficult slate removal. During the 1950s/60s extraction had become difficult, because after 170 years of extraction many of the unsystematically dumped tips were beginning to slide into some of the major pit workings, and after an enormous fall in the Garret area of the quarry in 1966, production had ceased almost permanently. It was however decided that some final work could be done by clearing some of the waste from the Garret fall. This involved making an access road for more modern quarry vehicles across some of the terraces, to the rockfall. This amount of slate won by this method was small and all production stopped by 1969.

At the Receiver's instruction a public auction was arranged, intended to pay off some of the quarry's debts. The auctions were held on 12 and 13 December 1969. The auctioneer's national advertisement (in The Guardian 29 November 1969), the event was described as "An auction sale of machine tools and stocks, four Hunslet locos, and engine and boat fittings". The locomotives referred to, lots 613–616, were "Dolbadarn", "Red Damsel", "Wild Aster" and "Irish Mail". Before the bidding started, it was announced that Gwynedd County Council had placed a Preservation Order on the Gilfach Ddu workshops, and many items within it.

Transport

The original connection between the quarry and the company's port at Y Felinheli was the Dinorwic Railway, a gauge line built in 1824. This was worked by horses and it soon became apparent that it was inadequate for the traffic generated by the quarry. A number of surveys of alternative routes were undertaken by members of the Spooner family, the result of which was the construction of a new railway which opened in 1848: the gauge Padarn Railway which operated as the quarry's main transport link until closure in 1961.

Tramways The first use of railways at the quarry came around 1800 when the first internal tramways were in use. These first lines were worked using horse- and hand- power. For the next seventy years, the tramway system grew until it reached the point where more powerful traction was required. The first steam locomotives used were small vertical boiler locos supplied by De Winton's of Caernarfon. In 1870 the first locomotive supplied by the Hunslet Engine Company arrived at the quarry, and the majority of the locomotives that worked at Dinorwic were eventually supplied by Hunslet.

Between 1935 and 1949 the Quarry acquired 22 light internal combustion rail tractors for use on the levels. Half of these were new, the other half second-hand. Their survival rate did not match those of the steam locomotives, and when the quarry closed in 1969 only three still survived.

Although a nominal two-foot gauge, the actual gauge between the rails at Dinorwic was in common with its neighbour Penrhyn, but fractionally narrower than the public lines of the Ffestiniog Railway or North Wales Narrow Gauge Railway which were .

Locomotives Early steam locomotives were used by the quarry, and built by De Winton & Co. But from 1870 the quarry acquired most of its locomotives new from the Hunslet Engine Company of Leeds. These were purpose-built, initially using a series of Hunslet general/unclassified designs, but after 1886 these fell into one of three classes: Alice Port: larger and designed primarily to work at Port Dinorwic, although Michael never did. Tram or Mills: worked on marshaling duties on the Padarn–Peris Tram Line, which linked the quarry mills to the Padarn Railway for transportation to Port Dinorwic.

Orig. name / number Later name Image Builder Year acquired Year sold NotesWellingtonDe Wintonc18701898HarrietDe Winton1874pre 1895PerisDe Winton1875pre 1895VictoriaDe Winton1876pre 1895PadarnDe Wintonc1898?DinorwicCharlieHunslet1870by 1919GeorgeMinstrel ParkHunslet1877by 1919LouisaHunslet1877by 1989SybilW. G. Bagnall1906?Restoration project taking place at the West Lancashire Light RailwayNo.70Barclay & Sons19311962ElidirAvonside Engine19331966VelinheliHunslet18861965Alice classNow preserved at the Launceston Steam Railway. Currently on loan to the Ffestiniog Railway.AliceKing of the ScarletsHunslet18891965 Alice classPreserved at the Statfold Barn RailwayEnidRed Damsel later ElidirHunslet18891969Alice classNo.1Rough PupHunslet18911968Alice classPreserved at the NGMNo.2CloisterHunslet18921962Alice classPreserved at the Statfold Barn RailwayThe FirstBernsteinHunslet18921967Alice classThe SecondCovertcoatHunslet18981964Alice classWellingtonGeorge B.Hunslet18981965Alice classNow at the Bala Lake RailwayNo.3Holy WarHunslet19021968Alice classNo.4AliceHunslet19021972Alice classNo.5Maid Marian(briefly Covertcoat)Hunslet19031966Alice classNo.6Irish MailHunslet19031969Alice classPreserved at West Lancashire Light RailwayNo.7Wild Aster now Thomas BachHunslet19041969Alice classNow running on the Llanberis Lake RailwayNo.1Lady JoanHunslet19221967Port classPreserved at Bredgar and Wormshill Light RailwayNo.2DolbadarnHunslet19221969Port classMichaelHunslet19321965Port classPreserved at the Statford Barn RailwayVaenolJerry MHunslet18951967Tram/Mills classNow at the Hollycombe Steam CollectionPort DinorwicCacklerHunslet18981966Tram/Mills class

Port Dinorwic

Port Dinorwic (Y Felinheli) was initially only a tidal creek on the Menai Strait's mainland shore called Aber-Pwll, Moel-y-Don, or Felin Heli. The Assheton-Smith family of Vaynol established a tiny wharf on a marshy inlet to convey the output of its Dinorwic quarry in 1793, which marked the beginning of the development of the dock system and related buildings. It was located directly downstream of a tide-powered grain mill that gave the region its Welsh name, Y Felinheli, and replaced an earlier setup where slate was lightered into the Menai Straits from 500 metres to the southwest. Slates from Dinorwic quarries were hoisted onto lighters and transported to ships anchored further offshore in the Menai Strait until the quays were opened in 1809 allowing ships to be loaded directly. The name Port Dinorwic was being used by 1824, and in this year a tramroad from Dinorwic quarries (the Dinorwic Railway) was opened.

In 1848, a steam-operated railway on a new track replaced the tramroad and operated until 1961. The Padarn Railway, or the Dinorwic Quarries Railway as it was also known, belonged to the quarry company. It was constructed with a four-foot gauge but transported slate waggons with a nominal two-foot (centre-to-centre) gauge from the Gilfach-ddu quarry yard to Penscoins at the top of the escarpment with a view of Port Dinorwic. From the transporters, they were unloaded here and lowered down a self-acting incline to the port, where locomotives moved them to the quays. Despite the fact that these locos were close to but not identical to those employed in the quarry, they were occasionally moved between places. The buffer beams on the port locos caused particular difficulties when trying to get them up the inclines to the higher levels of the quarry, but it was achieved.

Docks and quays were constructed in 1809, lock gates were added in 1828, dry docks and engineering facilities were built in the 1830s, a new outer basin was finished in 1854, an outer lock was added in 1897, and a new sea wall was built in 1905 between the harbour and basin to extend the quays. In 1852, a standard gauge extension of the Chester and Holyhead Railway reached Port Dinorwic, although nearly 90% of the slate continued to be transported by sea, exclusively in rented vessels. The dry dock was a unique facility in North Wales, making it very valuable to coastal shipping while the vessels were there. The engineering shops of The Dry Dock Co. also were looking to have Merddin Emrys's boiler repaired with new copper fireboxes and retubing the FR Co. got estimates from Avonside Engine Company of Bristol and the Quarry Engineering Works at Port Dinorwic. The boiler was eventually sent to Bristol to get the work done.