Ares I was the crew launch vehicle that was being developed by NASA as part of the Constellation program. The name "Ares" refers to the Greek deity Ares, who is identified with the Roman god Mars. Ares I was originally known as the "Crew Launch Vehicle" (CLV).

NASA planned to use Ares I to launch Orion, the spacecraft intended for NASA human spaceflight missions after the Space Shuttle was retired in 2011. Ares I was to complement the larger, uncrewed Ares V, which was the cargo launch vehicle for Constellation. NASA selected the Ares designs for their anticipated overall safety, reliability and cost-effectiveness. However, the Constellation program, including Ares I, was cancelled by U.S. president Barack Obama in October 2010 with the passage of his 2010 NASA authorization bill. In September 2011, NASA detailed the Space Launch System as its new vehicle for human exploration beyond Earth's orbit.

Development

Advanced Transportation System Studies In 1995 Lockheed Martin produced an Advanced Transportation System Studies (ATSS) report for the Marshall Space Flight Center. A section of the ATSS report describes several possible vehicles much like the Ares I design, with liquid rocket second stages stacked above segmented solid rocket booster (SRB) first stages. The variants that were considered included both the J-2S engines and Space Shuttle Main Engines (SSMEs) for the second stage. The variants also assumed use of the Advanced Solid Rocket Motor (ASRM) as a first stage, but the ASRM was cancelled in 1993 due to significant cost overruns.

Exploration Systems Architecture Study

President George W. Bush had announced the Vision for Space Exploration in January 2004, and NASA under Sean O'Keefe had solicited plans for a Crew Exploration Vehicle from multiple bidders, with the plan for having two competing teams. These plans were discarded by incoming administrator Michael Griffin, and on April 29, 2005, NASA chartered the Exploration Systems Architecture Study to accomplish specific goals:

determine the "top-level requirements and configurations for crew and cargo launch systems to support the lunar and Mars exploration programs" assess the "CEV requirements and plans to enable the CEV to provide crew transport to the ISS" "develop a reference lunar exploration architecture concept to support sustained human and robotic lunar exploration operations" "identify key technologies required to enable and significantly enhance these reference exploration systems"

A Shuttle-derived launch architecture was selected by NASA for the Ares I. Originally, the crewed vehicle would have used a four-segment solid rocket booster (SRB) for the first stage, and a simplified Space Shuttle Main Engine (SSME) for the second stage. An uncrewed version was to use a five-segment booster with the same second stage. Shortly after the initial design was approved, additional tests revealed that the Orion spacecraft would be too heavy for the four-segment booster to lift, and in January 2006 NASA announced they would slightly reduce the size of the Orion spacecraft, add a fifth segment to the solid-rocket first stage, and replace the single SSME with the Apollo-derived J-2X motor. While the change from a four-segment first stage to a five-segment version would allow NASA to construct virtually identical motors, the main reason for the change to the five-segment booster was the move to the J-2X.

The Exploration Systems Architecture Study concluded that the cost and safety of the Ares was superior to that of either of the Evolved Expendable Launch Vehicle (EELVs). The cost estimates in the study were based on the assumption that new launch pads would be needed for human-rated EELVs. The facilities for the current EELVs (LC-37 for Delta IV, LC-41 for Atlas V) are in place and could be modified, but this may not have been the most cost effective solution as LC-37 is a contractor owned and operated (COGO) facility and modifications for the Delta IV H were determined to be similar to those required for Ares I.. The ESAS launch safety estimates for the Ares were based on the Space Shuttle, despite the differences, and included only launches after the post-Challenger Space Shuttle redesign. The estimate counted each Shuttle launch as two safe launches of the Ares booster. The safety of the Atlas V and Delta IV was estimated from the failure rates of all Delta II, Atlas-Centaur, and Titan launches since 1992, although they are not similar designs.

Role in Constellation program

Ares I was the crew launch component of the Constellation program. Originally named the "Crew Launch Vehicle" or CLV, the Ares name was chosen from the Greek deity Ares. Unlike the Space Shuttle, where both crew and cargo were launched simultaneously on the same rocket, the plans for Project Constellation outlined having two separate launch vehicles, the Ares I and the Ares V, for crew and cargo, respectively. Having two separate launch vehicles allows for more specialized designs for the crew and heavy cargo launch rockets.

The Ares I rocket was specifically being designed to launch the Orion Multi-Purpose Crew Vehicle. Orion was intended as a crew capsule, similar in design to the Apollo program capsule, to transport astronauts to the International Space Station, the Moon, and eventually Mars. Ares I might have also delivered some (limited) resources to orbit, including supplies for the International Space Station or subsequent delivery to the planned lunar base.

Contractor selection NASA selected Alliant Techsystems, the builder of the Space Shuttle Solid Rocket Boosters, as the prime contractor for the Ares I first stage. NASA announced that Rocketdyne would be the main subcontractor for the J-2X rocket engine on July 16, 2007. NASA selected Boeing to provide and install the avionics for the Ares I rocket on December 12, 2007.

On August 28, 2007, NASA awarded the Ares I Upper Stage manufacturing contract to Boeing. The upper stage of Ares I was to have been built at Michoud Aerospace Factory, which was used for the Space Shuttle's External Tank and the Saturn V's S-IC first stage.

J-2X engines

At approximately US$20–25 million per engine, the Rocketdyne-designed and produced J-2X would have cost less than half as much as the more complex RS-25 engine (around $55 million). Unlike the Space Shuttle Main Engine, which was designed to start on the ground, the J-2X was designed from inception to be started in both mid-air and in near-vacuum. This air-start capability was critical, especially in the original J-2 engine used on the Saturn V's S-IVB stage, to propel the Apollo spacecraft to the Moon. The Space Shuttle Main Engine, on the other hand, would have required extensive modifications to add an air-start capability

System requirements review

On January 4, 2007, NASA announced that the Ares I had completed its system requirements review, the first such review completed for any crewed spacecraft design since the Space Shuttle. This review was the first major milestone in the design process, and was intended to ensure that the Ares I launch system met all the requirements necessary for the Constellation Program. In addition to the release of the review, NASA also announced that a redesign in the tank hardware was made. Instead of separate LH2 and LO2 tanks, separated by an "intertank" like that of the Space Shuttle External Tank, the new LH2 and LOX tanks would have been separated by a common bulkhead like that employed on the Saturn V S-II and S-IVB stages. This would have provided a significant mass saving and eliminated the need to design a second stage interstage unit that would have had to carry the weight of the Orion spacecraft with it.

Analysis and testing

In January 2008, NASA Watch revealed that the first stage solid rocket of the Ares I could have created high vibrations during the first few minutes of ascent. The vibrations would have been caused by thrust oscillations inside the first stage. – note: article does not seem to still be available online (February 19, 2010) NASA officials had identified the potential problem at the Ares I system design review in late October 2007, stating in a press release that it wanted to solve it by March 2008. NASA admitted that this problem was very severe, rating it four out of five on a risk scale, but the agency was very confident in solving it. The mitigation approach developed by the Ares engineering team included active and passive vibration damping, adding an active tuned-mass absorber and a passive "compliance structure" – essentially a spring-loaded ring that would have detuned the Ares I stack.Thrust Oscillation Mitigation Approach. NASA NASA also pointed out that, since this would have been a new launch system, like the Apollo or Space Shuttle systems, it was normal for such problems to arise during the development stage. According to NASA, analysis of the data and telemetry from the Ares I-X flight showed that vibrations from thrust oscillation were within the normal range for a Space Shuttle flight.Video of Ares I-X First Stage splashdown from NASA via Space.com, November 10, 2009

A study released in July 2009 by the 45th Space Wing of the US Air Force concluded that an abort 30–60 seconds after launch would have a ≈100% chance of killing all crew, due to the capsule being engulfed until ground impact by a cloud of solid propellant fragments, which would melt the capsule's nylon parachute material. NASA's study showed the crew capsule would have flown beyond the more severe danger.

The Ares I igniter was an advanced version of the flight-proven igniter used on the Space Shuttle's solid rocket boosters. It was approximately in diameter and long, and took advantage of upgraded insulation materials that had improved thermal properties to protect the igniter's case from the burning solid propellant. NASA successfully completed test firing of the igniter for the Ares I engines on March 10, 2009, at ATK Launch Systems test facilities near Promontory, Utah. The igniter test generated a flame in length, and preliminary data showed the igniter performed as planned.

Development of the Ares I propulsion elements continued to make strong progress. On September 10, 2009, the first Ares I development motor (DM-1) was successfully tested in a full-scale, full-duration test firing."NASA and ATK Successfully Test Ares First Stage Motor". http://www.nasa.gov/mission_pages/constellation/ares/dm1_success.html. Retrieved October 21, 2011. This test was followed by two more development motor tests, DM-2 on August 31, 2010, and DM-3 on September 8, 2011. For DM-2 the motor was cooled to a core temperature of 40 degrees Fahrenheit (4 degrees Celsius), and for DM-3 it was heated to above 90 degrees Fahrenheit (32 degrees Celsius). In addition to other objectives, these two tests validated Ares motor performance at extreme temperatures."NASA and ATK Successfully Test Five-Segment Solid Rocket Motor". http://www.nasa.gov/mission_pages/constellation/ares/10-202.html. Retrieved October 21, 2011. NASA conducted a successful 500-second test firing of the J-2X rocket engine at John C. Stennis Space Center in November 2011.

The Ares I prototype, Ares I-X, successfully completed a test launch on October 28, 2009. Launch Pad 39B was damaged more than with a Space Shuttle launch. During descent, one of the three parachutes of the Ares I-X's first stage failed to open, and another opened only partially, causing the booster to splash down harder and suffer structural damage. The launch accomplished all primary test objectives.

Schedule and cost